Backward assembly planning

An assembly planning system is presented that operates based on a recursive decomposition of an assembly into subassemblies, and uses design for assembly (DFA) analysis to guide the generation of a preferred assembly plan. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. The system handles nonreversible as well as reversible assembly tasks through backward assembly planning.<<ETX>>

[1]  Ann Patricia Fothergill,et al.  An Interpreter for a Language for Describing Assemblies , 1980, Artif. Intell..

[2]  ARISTIDES A. G. REQUICHA,et al.  Representations for Rigid Solids: Theory, Methods, and Systems , 1980, CSUR.

[3]  Heedong Ko,et al.  Automatic assembling procedure generation from mating conditions , 1987 .

[4]  Thomas L. DeFazio,et al.  Simplified generation of all mechanical assembly sequences , 1987, IEEE Journal on Robotics and Automation.

[5]  Yeong Gil Shin,et al.  Automatic construction of assembly partial-order graphs , 1988, [Proceedings] 1988 International Conference on Computer Integrated Manufacturing.

[6]  Carme Torras,et al.  A group-theoretic approach to the computation of symbolic part relations , 1988, IEEE J. Robotics Autom..

[7]  C. S. George Lee,et al.  Precedence knowledge in feature mating operation assembly planning , 1989, Proceedings, 1989 International Conference on Robotics and Automation.

[8]  Leila De Floriani,et al.  A graph model for face-to-face assembly , 1989, Proceedings, 1989 International Conference on Robotics and Automation.

[9]  Sukhan Lee,et al.  Assembly planning based on geometric reasoning , 1990, Comput. Graph..

[10]  Arthur C. Sanderson,et al.  AND/OR graph representation of assembly plans , 1986, IEEE Trans. Robotics Autom..

[11]  Y. G. Shin,et al.  A cooperative planning system for flexible assembly , 1990, [1990] Proceedings. Rensselaer's Second International Conference on Computer Integrated Manufacturing.

[12]  Sukhan Lee,et al.  Assembly planning based on subassembly extraction , 1990, Proceedings., IEEE International Conference on Robotics and Automation.

[13]  C. S. George Lee,et al.  An automatic assembly planning system , 1990, Proceedings., IEEE International Conference on Robotics and Automation.

[14]  R. Hoffman Automated assembly planning for B-rep products , 1990, 1990 IEEE International Conference on Systems Engineering.

[15]  Thomas L. DeFazio,et al.  An integrated computer aid for generating and evaluating assembly sequences for mechanical products , 1991, IEEE Trans. Robotics Autom..