Identification and Prioritization of Critical Risk Factors of Commercial and Recreational Complex Building Projects: A Delphi Study Using the TOPSIS Method

Construction development of Commercial and Recreational Complex Building Projects (CRCBPs) is one of the community needs of many developing countries. Since the implementation of these projects is usually very costly, identifying and evaluating their Critical Risk Factors (CRFs) are of significant importance. Therefore, the current study aims to identify and prioritize CRFs of CRCBPs in the Iranian context. A descriptive-survey method was used in this research; the statistical population, selected based on the purposive sampling method, includes 30 construction experts with hands-on experience in CRCBPs. A questionnaire related to the risk identification stage was developed based on a detailed study of the research literature and also using the Delphi survey method; 82 various risks were finally identified. In order to confirm the opinions of experts in identifying the potential risks, Kendall’s coefficient of concordance was used. In the first stage of data analysis, qualitative evaluation was performed by calculating the severity of risk effect and determining the cumulative risk index, based on which 25 CRFs of CRCBPs were identified for more accurate evaluation. At this stage, the identified CRFs were evaluated based on multi-criteria decision-making techniques and using the TOPSIS technique. Results show that the ten CRFs of CRCBPs are external threats from international relations, exchange rate changes, bank interest rate fluctuations, traffic licenses, access to skilled labor, changes in regional regulations, the condition of adjacent buildings, fluctuations and changes in inflation, failure to select a suitable and qualified consultant, and employer’s previous experiences and records. Obviously, the current study’s results and findings can be considered by CRCBPs in both the private and public sectors for proper effective risk identification, evaluation, and mitigation.

[1]  Gwang-Hee Kim,et al.  Comparison of Risk Assessment for a Nuclear Power Plant Construction Project Based on Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process , 2016 .

[2]  Robert L. K. Tiong,et al.  Perceptions of Singapore construction contractors on construction risk identification , 2008 .

[3]  Abbas Mardani,et al.  A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study , 2015 .

[4]  Abdulmaten Taroun,et al.  Towards a better modelling and assessment of construction risk: Insights from a literature review , 2014 .

[5]  Aminah Robinson Fayek,et al.  Risk Identification and Common Risks in Construction: Literature Review and Content Analysis , 2019, Journal of Construction Engineering and Management.

[6]  Ming-Fung Francis Siu,et al.  A DATA-DRIVEN APPROACH TO IDENTIFY-QUANTIFY-ANALYSE CONSTRUCTION RISK FOR HONG KONG NEC PROJECTS , 2018, JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT.

[7]  Christian Wagner,et al.  An exploration of issues and limitations in current methods of TOPSIS and fuzzy TOPSIS , 2016, 2016 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE).

[8]  Prasanta Kumar Dey,et al.  Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery , 2012 .

[9]  Jagadeesh Putta,et al.  Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model , 2021, Buildings.

[10]  Tong Yun-huan Algorithm Study on Models of Multiple Objective Risk Decision under Principal and Subordinate Hierarch Decision-making , 2007 .

[11]  A. Hosseini,et al.  Evaluating and analysis of socio-economic variables on land and housing prices in Mashhad, Iran , 2018, Sustainable Cities and Society.

[12]  Hadi Sarvari,et al.  A combination risk-based approach to post-earthquake temporary accommodation site selection: A case study in Iran , 2020 .

[13]  P. Lam,et al.  An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction , 2011 .

[14]  Daniel W. M. Chan,et al.  Evaluating urban housing development patterns in developing countries: Case study of Worn-out Urban Fabrics in Iran , 2021, Sustainable Cities and Society.

[15]  Jingfeng Yuan,et al.  Social network analysis for social risks of construction projects in high-density urban areas in China , 2018, Journal of Cleaner Production.

[16]  Nils O.E. Olsson,et al.  Categorizing Risks in Seven Large Projects—Which Risks Do the Projects Focus On? , 2010 .

[17]  Sara Marcelino-Sádaba,et al.  Project risk management methodology for small firms , 2014 .

[18]  Sorin Nadaban,et al.  Fuzzy TOPSIS: A General View , 2016 .

[19]  Thais da C. L. Alves,et al.  CBA-Based Evaluation Method of the Impact of Defects in Residential Buildings: Assessing Risks towards Making Sustainable Decisions on Continuous Improvement Activities , 2021, Sustainability.

[20]  Gavin Shatkin The City and the Bottom Line: Urban Megaprojects and the Privatization of Planning in Southeast Asia , 2008 .

[21]  Roy C. Schmidt,et al.  MANAGING DELPHI SURVEYS USING NONPARAMETRIC STATISTICAL TECHNIQUES , 1997 .

[22]  Rafaela Alfalla-Luque,et al.  Risk Management in Megaprojects , 2014 .

[23]  Zhansheng Liu,et al.  Digital Twin-Based Safety Risk Coupling of Prefabricated Building Hoisting , 2021, Sensors.

[24]  Louis Anthony (Tony) Cox,et al.  Some Limitations of Qualitative Risk Rating Systems , 2005, Risk analysis : an official publication of the Society for Risk Analysis.

[25]  Hamzah Abdul-Rahman,et al.  Applying Risk Management Workshop for a Public Construction Project: Case Study , 2013 .

[26]  Chun-Hung Chen,et al.  Developing a Risk Management Process for Infrastructure Projects Using IDEF0 , 2021 .

[27]  Franck Marle,et al.  A multi-criteria decision-making process for project risk management method selection , 2012 .

[28]  Albert P.C. Chan,et al.  Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study , 2009 .

[29]  Osman Taylan,et al.  Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..

[30]  Daniel W. M. Chan,et al.  Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian Water and Wastewater Company , 2020 .

[31]  Kenneth A. Froot The Intermediation of Financial Risks: Evolution in the Catastrophe Reinsurance Market , 2008 .

[32]  Mladen Radujković,et al.  Risk Breakdown Structure for Construction Projects on Existing Buildings , 2014 .

[33]  Daniel W.M. Chan,et al.  Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey , 2019, Sustainable Development.

[34]  M. Beer,et al.  Approaches to Risk Identification in Public–Private Partnership Projects: Malaysian Private Partners’ Overview , 2019, Administrative Sciences.

[35]  J. Tamošaitienė,et al.  Assessing the Barriers and Risks to Private Sector Participation in Infrastructure Construction Projects in Developing Countries of Middle East , 2020, Sustainability.

[36]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[37]  K. Lai,et al.  An integrated real options evaluating model for information technology projects under multiple risks , 2009 .

[38]  R. Arnott CHAPTER 6 Housing Policy in Developing Countries : The Importance of the Informal Economy , 2008 .

[39]  Patrick T.I. Lam,et al.  Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region , 2010 .

[40]  Zhen Chen,et al.  An analytic network process for risks assessment in commercial real estate development , 2009 .

[41]  S. Rane,et al.  Ranking the risk categories in international projects using the TOPSIS method , 2018 .

[42]  Cinzia Muriana,et al.  Project risk management: A deterministic quantitative technique for assessment and mitigation , 2017 .

[43]  Daniel W.M. Chan,et al.  Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in South Australia , 2014 .

[44]  G. Abatecola,et al.  Hambrick and Mason’s “Upper Echelons Theory”: evolution and open avenues , 2018, Journal of Management History.

[45]  Marcos G. Perroni,et al.  Evolution of Risks for Energy Companies from the Energy Efficiency Perspective: The Brazilian Case , 2015 .

[46]  Maude Brunet Making sense of a governance framework for megaprojects: The challenge of finding equilibrium , 2020 .

[47]  Semra Comu,et al.  A risk assessment model of commercial real estate development projects in developing countries , 2021, Journal of Construction Engineering, Management & Innovation.

[48]  Ibrahim,et al.  Risk Analysis for Mega Shopping Mall Projects in Egypt , 2015 .

[49]  Daniel W.M. Chan,et al.  Developing a performance measurement index (PMI) for target cost contracts in construction : a Delphi study , 2012 .

[50]  G. Abatecola,et al.  Upper Echelons and Executive Profiles in the Construction Value Chain: Evidence from Italy , 2016 .

[51]  Derek Thurnell,et al.  BIM Adoption in the Cambodian Construction Industry: Key Drivers and Barriers , 2021, ISPRS Int. J. Geo Inf..

[52]  P. F. Silva,et al.  Risk Management of Bored Piling Construction on Sandy Soils with Real-Time Cost Control , 2021, Infrastructures.

[53]  Timothy O. Olawumi,et al.  Critical success factors for managing construction small and medium-sized enterprises in developing countries of Middle East: Evidence from Iranian construction enterprises , 2021 .

[54]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[55]  Eric M. Wetzel,et al.  The use of a BIM-based framework to support safe facility management processes , 2015 .

[56]  Chia-Chi Sun,et al.  A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods , 2010, Expert Syst. Appl..

[57]  Hanbin Luo,et al.  Risk Level Evaluation on Construction Project Lifecycle Using Fuzzy Comprehensive Evaluation and TOPSIS , 2018, Symmetry.

[58]  Mohan M. Kumaraswamy,et al.  Governmental role in BOT-led infrastructure development , 2001 .

[59]  Shui-Long Shen,et al.  Risk Assessment Using a New Consulting Process in Fuzzy AHP , 2020 .

[60]  Fatih Tüysüz,et al.  An in-depth review of theory of the TOPSIS method: An experimental analysis , 2020 .

[61]  Vahidreza Yousefi,et al.  Project Portfolio Construction Using Extreme Value Theory , 2021, Sustainability.

[62]  Mohammad R. Jahan-Parvar,et al.  The impact of financial sanctions: The case of Iran , 2021 .

[63]  Robert J. Chapman,et al.  The effectiveness of working group risk identification and assessment techniques , 1998 .

[64]  Manuela Ingaldi,et al.  Structural Failures Risk Analysis as a Tool Supporting Corporate Responsibility , 2021, Journal of Risk and Financial Management.

[65]  Ian Flood,et al.  A Comparative Study of the AHP and TOPSIS Techniques for Dam Site Selection Using GIS: A Case Study of Sistan and Baluchestan Province, Iran , 2018, Geosciences.

[66]  Daniel W. M. Chan,et al.  Determining and assessing the risks of commercial and recreational complex building projects in developing countries: a survey of experts in Iran , 2020 .

[67]  Edmundas Kazimieras Zavadskas,et al.  Multi-criteria Risk Assessment of a Construction Project , 2013, ITQM.

[68]  Jolanta Tamošaitienė,et al.  IDENTIFYING AND PRIORITIZING THE SELECTION CRITERIA OF APPROPRIATE REPAIR AND MAINTENANCE METHODS FOR COMMERCIAL BUILDINGS , 2021, International Journal of Strategic Property Management.

[69]  J. Tian,et al.  Fuzzy Analytic Hierarchy Process for Risk Assessment to General- assembling of Satellite , 2013 .

[70]  Albert P.C. Chan,et al.  Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study , 2007 .

[71]  Min-Yuan Cheng,et al.  Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry , 2021, Sustainability.

[72]  Ching-Lai Hwang,et al.  Methods for Multiple Attribute Decision Making , 1981 .

[73]  M. P. Jalal,et al.  A hybrid framework to model factors affecting construction labour productivity , 2019, Journal of Financial Management of Property and Construction.

[74]  Hong Zhou,et al.  Risk assessment and management via multi-source information fusion for undersea tunnel construction , 2020 .

[75]  Chris Chapman,et al.  Transforming project risk management into project uncertainty management , 2003 .

[76]  Edmundas Kazimieras Zavadskas,et al.  A Hybrid MCDM Technique for Risk Management in Construction Projects , 2018, Symmetry.

[77]  J. Tamošaitienė,et al.  A Risk Based Approach to Evaluating the Impacts of Zayanderood Drought on Sustainable Development Indicators of Riverside Urban in Isfahan-Iran , 2019, Sustainability.

[78]  Geoffrey Qiping Shen,et al.  Critical risk factors in the application of modular integrated construction: a systematic review , 2019, International Journal of Construction Management.

[79]  Igor Linkov,et al.  Multi-criteria risk management with the use of DecernsMCDA: methods and case studies , 2016, Environment Systems and Decisions.

[80]  Morteza Yazdani,et al.  A state-of the-art survey of TOPSIS applications , 2012, Expert Syst. Appl..

[81]  Carlo Rafele,et al.  Managing Project Risks Using a Cross Risk Breakdown Matrix , 2006 .