An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
暂无分享,去创建一个
[1] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[2] Rainer Kolisch,et al. Efficient priority rules for the resource-constrained project scheduling problem , 1996 .
[3] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[4] Toshihide Ibaraki,et al. Formulation and Tabu Search Algorithm for the Resource Constrained Project Scheduling Problem , 2002 .
[5] Christian Artigues,et al. Insertion techniques for static and dynamic resource-constrained project scheduling , 2003, Eur. J. Oper. Res..
[6] Mario Vanhoucke,et al. A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem , 2007, Oper. Res..
[7] R. Kolisch,et al. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis , 1998 .
[8] Robert Klein,et al. Project scheduling with time-varying resource constraints , 2000 .
[9] Yeong-Dae Kim,et al. A simulated annealing algorithm for resource constrained project scheduling problems , 1997 .
[10] Rainer Kolisch,et al. Adaptive search for solving hard project scheduling problems , 1996 .
[11] Bassem Jarboui,et al. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems , 2008, Appl. Math. Comput..
[12] Rainer Kolisch,et al. PSPLIB - a project scheduling problem library , 1996 .
[13] Said Salhi,et al. An investigation into the relationship of heuristic performance with network-resource characteristics , 1997 .
[14] Kevin E Lansey,et al. Application of the Shuffled Frog Leaping Algorithm for the Optimization of a General Large-Scale Water Supply System , 2009 .
[15] Grzegorz Waligóra,et al. Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times , 2008, Eur. J. Oper. Res..
[16] Wang Chen,et al. An efficient hybrid algorithm for resource-constrained project scheduling , 2010, Inf. Sci..
[17] HONGQI PAN,et al. A hybrid henetic algorithm for project scheduling , 2001 .
[18] Rainer Kolisch,et al. Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes , 1995 .
[19] Alireza Rahimi-Vahed,et al. Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm , 2008, Soft Comput..
[20] Anurag Agarwal,et al. A Neurogenetic approach for the resource-constrained project scheduling problem , 2011, Comput. Oper. Res..
[21] Kevin E Lansey,et al. Optimization of Water Distribution Network Design Using the Shuffled Frog Leaping Algorithm , 2003 .
[22] E. W. Davis,et al. Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .
[23] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[24] Mauricio G. C. Resende,et al. A random key based genetic algorithm for the resource constrained project scheduling problem , 2009, Comput. Oper. Res..
[25] E. Rolland,et al. Tabu search in audit scheduling , 1998, Eur. J. Oper. Res..
[26] Bert De Reyck,et al. A hybrid scatter search/electromagnetism meta-heuristic for project scheduling , 2006, Eur. J. Oper. Res..
[27] Muzaffar Eusuff,et al. Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization , 2006 .
[28] Kathy Chin Leong. High-tech vineyards , 1989 .
[29] Y. Kochetov,et al. Evolutionary Local Search with Variable Neighborhood for the Resource Constrained Project Scheduling Problem , 2003 .
[30] Enrique Alba,et al. Software project management with GAs , 2007, Inf. Sci..
[31] V. Jorge Leon,et al. Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling , 1995 .
[32] Alireza Rahimi-Vahed,et al. A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problem , 2007, Comput. Ind. Eng..
[33] Xiaodong Li,et al. Particle swarm optimization-based schemes for resource-constrained project scheduling , 2005 .
[34] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[35] J. B. Ritter,et al. The Critical-Path Method , 1965 .
[36] Sönke Hartmann. Project Scheduling under Limited Resources: Models, Methods, and Applications , 2000 .
[37] Concepción Maroto,et al. A Robust Genetic Algorithm for Resource Allocation in Project Scheduling , 2001, Ann. Oper. Res..
[38] Francisco Ballestín,et al. A hybrid genetic algorithm for the resource-constrained project scheduling problem , 2008, Eur. J. Oper. Res..
[39] Robert J Willis,et al. An iterative scheduling technique for resource-constrained project scheduling , 1992 .
[40] Andreas Drexl,et al. Scheduling of Project Networks by Job Assignment , 1991 .
[41] Sönke Hartmann,et al. A competitive genetic algorithm for resource-constrained project scheduling , 1998 .
[42] A. Rahimi-Vahed,et al. A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem , 2009 .
[43] Andreas Schirmer,et al. Case‐based reasoning and improved adaptive search for project scheduling , 2000 .
[44] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[45] Fayez F. Boctor,et al. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes , 1996 .
[46] K. Bouleimen,et al. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version , 2003, Eur. J. Oper. Res..
[47] Sönke Hartmann,et al. Scheduling medical research experiments - an application of project scheduling methods , 1997 .
[48] Ramón Alvarez-Valdés Olaguíbel,et al. Chapter 5 – HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS , 1989 .
[49] Sönke Hartmann,et al. A self‐adapting genetic algorithm for project scheduling under resource constraints , 2002 .
[50] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .