Sustainable management of end-of-life systems
暂无分享,去创建一个
Benoît Iung | Ayeley P. Tchangani | François Pérès | Matthieu Godichaud | A. Tchangani | F. Pérés | B. Iung | M. Godichaud
[1] Philippe Weber,et al. Bayesian networks Applications on Dependability, Risk Analysis and Maintenance , 2009 .
[2] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[3] Philippe Weber,et al. Complex system reliability modelling with Dynamic Object Oriented Bayesian Networks (DOOBN) , 2006, Reliab. Eng. Syst. Saf..
[4] Stuart J. Russell,et al. Dynamic bayesian networks: representation, inference and learning , 2002 .
[5] Surendra M. Gupta,et al. Disassembly-to-order system using Linear Physical Programming , 2002, Conference Record 2002 IEEE International Symposium on Electronics and the Environment (Cat. No.02CH37273).
[6] F. Liu,et al. The voting analytic hierarchy process method for selecting supplier , 2005 .
[7] Simme Douwe Flapper,et al. Product recovery in stochastic remanufacturing systems with multiple reuse options , 2001, Eur. J. Oper. Res..
[8] Christopher S. Tang. Perspectives in supply chain risk management , 2006 .
[9] K. Inderfurth. Simple optimal replenishment and disposal policies for a product recovery system with leadtimes , 1997 .
[10] Ian M. Langella. Heuristics for demand-driven disassembly planning , 2007, Comput. Oper. Res..
[11] Steffen L. Lauritzen,et al. Representing and Solving Decision Problems with Limited Information , 2001, Manag. Sci..
[12] Finn V. Jensen,et al. Bayesian Networks and Decision Graphs , 2001, Statistics for Engineering and Information Science.
[13] Ayeley P. Tchangani,et al. Modèle pour la planification des stratégies de déconstruction des systèmes en fin de vie , 2010, J. Decis. Syst..
[14] B. Adenso-Díaz,et al. Reverse MRP under uncertain and imprecise demand , 2009 .
[15] David F. Pyke,et al. Periodic review, push inventory policies for remanufacturing , 2002, Eur. J. Oper. Res..
[16] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[17] Paul Xirouchakis,et al. Disassembly Scheduling with Capacity Constraints , 2002 .
[18] Matthieu Godichaud. Outils d'aide à la décision pour la sélection des filières de valorisation des produits de la déconstruction des systèmes en fin de vie : application au domaine aéronautique , 2009 .
[19] Adnan Darwiche,et al. Inference in belief networks: A procedural guide , 1996, Int. J. Approx. Reason..
[20] Surendra M. Gupta,et al. A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS , 2002 .
[21] P. Xirouchakis,et al. Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality , 2006 .
[22] Erwin van der Laan,et al. Leadtime effects and policy improvement for stochastic inventory control with remanufacturing , 2001 .
[23] Surendra M. Gupta,et al. Disassembly to order system under uncertainty , 2006 .
[24] Karl Inderfurth,et al. Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..
[25] Akihiko Mizuno,et al. Inventory control for a MARKOVIAN remanufacturing system with stochastic decomposition process , 2007 .
[26] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[27] Alfred J.D. Lambert,et al. Demand-driven disassembly optimization for electronic products , 2002 .
[28] Sid-Ali Addouche. Contribution à une démarche de conception optimisée des processus de désassemblage , 2003 .
[29] Surendra M. Gupta,et al. High-mix/low-volume batch of electronic equipment disassembly , 1998 .
[30] Dong-Ho Lee,et al. A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..
[31] Benoît Iung,et al. Formalisation of a new prognosis model for supporting proactive maintenance implementation on industrial system , 2008, Reliab. Eng. Syst. Saf..
[32] Rommert Dekker,et al. Controlling inventories with stochastic item returns: A basic model , 2002, Eur. J. Oper. Res..