Development of a computer program for underground mine stope optimisation using a heuristic algorithm

Stope layout optimisation improves the economic potential of any underground mining operation and maximises profitability over mine life. A limited number of algorithms are available for underground stope layout optimisation. However, the available algorithms do not guarantee an optimal solution in threedimensional space. In this paper, existing algorithms for underground stope layout optimisation were reviewed and a computer program called Stope Layout Optimizer 3D (SLO3D) was developed as a C# user interface to implement a heuristic algorithm for optimisation of underground stope boundaries. SLO3D provides an interactive environment to define and edit important parameters related to the stope layout optimisation, including block model parameters, stope geometry, and economic factors. Finally, an example is presented to demonstrate the implementation of algorithm with different stope limits and selection type strategies.

[1]  Kourosh Shahriar,et al.  A COMPUTER PROGRAM TO OPTIMIZE STOPE BOUNDARIES USING PROBABLE STOPE ALGORITHM , 2007 .

[2]  Erkan Topal,et al.  A new algorithm for stope boundary optimization , 2010 .

[3]  Xiaoyu Bai,et al.  A heuristic sublevel stope optimizer with multiple raises , 2014 .

[4]  Marcus Brazil,et al.  Optimisation in underground mining , 2007 .

[5]  R. Dimitrakopoulos,et al.  Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping , 2007 .

[6]  Alexandra M. Newman,et al.  Optimization-based heuristics for underground mine scheduling , 2015, Eur. J. Oper. Res..

[7]  Mirzaeian Yousef,et al.  OPTIMIZATION OF STOPE GEOMETRY USING PIECEWISE LINEAR FUNCTION AND MIP APPROACH , 2011 .

[8]  Don Suneth Sameera Sandanayake,et al.  Designing an optimal stope layout for underground mining based on a heuristic algorithm , 2015 .

[9]  Xiaoyu Bai,et al.  Underground stope optimization with network flow method , 2013, Comput. Geosci..

[10]  C. Alford,et al.  Optimisation in underground mine design , 1996 .

[11]  Majid Ataee-Pour A heuristic algorithm to optimise stope boundaries , 2000 .

[12]  Ratan Raj Tatiya Surface and underground excavations , 2013 .

[13]  M. Ataee-pour A Critical Survey of the Existing Stope Layout Optimization Techniques , 2005 .

[14]  K. Shahriar,et al.  Computer Based Optimization of Underground Mining Area , 2017 .

[15]  Erkan Topal,et al.  A heuristic approach to optimal design of an underground mine stope layout , 2015, Appl. Soft Comput..