NEW HEURISTICS FOR MINIMISING TOTAL COMPLETION TIME AND THE NUMBER OF TARDY JOBS CRITERIA ON A SINGLE MACHINE WITH RELEASE TIME
暂无分享,去创建一个
[1] E. Oyetunji. Truncation and composition of schedules: A good strategy for solving bicriteria scheduling problems , 2010 .
[2] E. O. Oyetunji. Assessing solution methods to mixed multi-objectives scheduling problems , 2011 .
[3] Jean-Charles Billaut,et al. Multicriteria Scheduling - Theory, Models and Algorithms (2. ed.) , 2006 .
[4] Elkanah Oyetunji,et al. Heuristics for Minimizing Total Completion Time on Single Machine with Release Time , 2007 .
[5] Bettina Rockenbach. Springer Lecture Notes in Economics and Mathematical Systems , 1994 .
[6] Maged M. Dessouky,et al. Single-Machine Scheduling of Unit-Time Jobs with Earliness and Tardiness Penalties , 1998, Math. Oper. Res..
[7] Wenqiang Zhang,et al. Multi-objective Local Search Combined with NSGA-II for Bi-criteria Permutation Flow Shop Scheduling Problem (特集 確率的最適化と機械学習の統計的設計と応用) , 2012 .
[8] Clifford Stein,et al. On the existence of schedules that are near-optimal for both makespan and total weighted completion time , 1997, Oper. Res. Lett..
[9] Jon M. Peha,et al. Heterogeneous-criteria scheduling: Minimizing weighted number of tardy jobs and weighted completion time , 1995, Comput. Oper. Res..
[10] Elkanah Oyetunji,et al. Hierarchical Minimization of Total Completion Time and Number of Tardy Jobs Criteria , 2008 .
[11] Emmanuel Jeannot,et al. Multicriteria Scheduling Heuristics for Gridrpc Systems , 2006, Int. J. High Perform. Comput. Appl..
[12] Sanja Petrovic,et al. An Introduction to Multiobjective Metaheuristics for Scheduling and Timetabling , 2004, Metaheuristics for Multiobjective Optimisation.
[13] Murat Köksalan,et al. Single machine scheduling with maximum earliness and number tardy , 2003, Comput. Ind. Eng..
[14] Abhyuday Desai. On using intelligent scheduling for multi-criteria optimization in a PC assembly shop , 2002 .
[15] Rakesh K. Sarin,et al. Scheduling with multiple performance measures: the one-machine case , 1986 .
[16] E. Burke,et al. A TUTORIAL ON MULTIOBJECTIVE METAHEURISTICS FOR SCHEDULING AND TIMETABLING , 2002 .
[17] Balazs Molnar. MULTI-CRITERIA SCHEDULING OF ORDER PICKING PROCESSES WITH SIMULATION OPTIMIZATION , 2005 .
[18] Alain Girault,et al. A bi-criteria scheduling heuristic for distributed embedded systems under reliability and real-time constraints , 2004, International Conference on Dependable Systems and Networks, 2004.
[19] Chinyao Low,et al. Modelling and heuristics of FMS scheduling with multiple objectives , 2006, Comput. Oper. Res..
[20] Yves Robert,et al. Multi-criteria scheduling of pipeline workflows , 2007, 2007 IEEE International Conference on Cluster Computing.
[21] A. Nagar,et al. Multiple and bicriteria scheduling : A literature survey , 1995 .
[22] Jean-Charles Billaut,et al. Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry , 2001, Eur. J. Oper. Res..
[23] Margaret W. Maxfield. SEQUENCING AND SCHEDULING IN REAL TIME ? QUICKLY , 1981 .
[24] Gary B. Lamont,et al. Multiobjective Evolutionary Algorithms: Analyzing the State-of-the-Art , 2000, Evolutionary Computation.
[25] A. E. Oluleye,et al. Heuristics for minimizing the number of tardy jobs on a single machine with release time , 2012 .
[26] Dalibor Klusácek,et al. Comparison Of Multi-Criteria Scheduling Techniques , 2008, CoreGRID Integration Workshop.
[27] Han Hoogeveen,et al. Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time , 1994, Oper. Res. Lett..
[28] Han Hoogeveen,et al. Multicriteria scheduling , 2005, Eur. J. Oper. Res..
[29] Elkanah Oyetunji,et al. Evaluating Solution Methods to Bicriteria Scheduling Problems , 2009 .
[30] Jan Karel Lenstra,et al. Sequencing and scheduling : an annotated bibliography , 1997 .
[31] Sanja Petrovic,et al. Decision support tool for multi-objective job shop scheduling problems with linguistically quantified decision functions , 2007, Decis. Support Syst..
[32] Jean-Charles Billaut,et al. Multicriteria scheduling , 2005, Eur. J. Oper. Res..
[33] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .