PCaDA statement of methods
暂无分享,去创建一个
[2] Jorge Ambrósio,et al. Influence of the aerodynamic forces on the pantograph–catenary system for high-speed trains , 2009 .
[3] A. Collina,et al. A procedure for the wear prediction of collector strip and contact wire in pantograph–catenary system , 2009 .
[4] Ferruccio Resta,et al. Impact of overhead line irregularity on current collection and diagnostics based on the measurement of pantograph dynamics , 2007 .
[5] Stefano Bruni,et al. Numerical and Hardware-In-the-Loop Tools for the Design of Very High Speed Pantograph-Catenary Systems , 2012 .
[6] H. Saunders,et al. Finite element procedures in engineering analysis , 1982 .
[7] Stefano Bruni,et al. Simulation Tools for Virtual Homologation of Pantographs , 2012 .
[8] Stefano Bruni,et al. Numerical Simulation of Pantograph-Overhead Equipment Interaction , 2002 .
[9] Giuseppe Bucca,et al. Adoption of different pantographs’ preloads to improve multiple collection and speed up existing lines , 2012 .
[10] A. Collina,et al. Effect of collector deformable modes in pantograph—catenary dynamic interaction , 2009 .