Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues

Abstract This paper derives the optimal replenishment lot size and shipment policy for an Economic Production Quantity (EPQ) model with multiple deliveries and rework of random defective items. The classic EPQ model assumes a continuous inventory issuing policy for satisfying demand and perfect quality for all items produced. However, in a real life vendor–buyer integrated system, multi-shipment policy is practically used in lieu of continuous issuing policy and generation of defective items is inevitable. It is assumed that the imperfect quality items fall into two groups: the scrap and the rework-able items. Failure in repair exists, hence additional scrap items generated. The finished items can only be delivered to customers if the whole lot is quality assured at the end of rework. Mathematical modeling is used in this study and the long-run average production–inventory-delivery cost function is derived. Convexity of the cost function is proved by using the Hessian matrix equations. The closed-form optimal replenishment lot size and optimal number of shipments that minimize the long-run average costs for such an EPQ model are derived. Special case is examined, and a numerical example is provided to show its practical usage.

[1]  Tonya Boone,et al.  The Impact of Imperfect Processes on Production Run Times , 2000, Decis. Sci..

[2]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[3]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[4]  Tadashi Dohi,et al.  Minimal repair policies for an economic manufacturing process , 1998 .

[5]  Amir Abbas Najafi,et al.  ECONOMIC PRODUCTION QUANTITY MODEL WITH SCRAPPED ITEMS AND LIMITED PRODUCTION CAPACITY , 2010 .

[6]  Ruhul A. Sarker,et al.  An optimal batch size for a production system operating under periodic delivery policy , 1999 .

[7]  Yuan-Shyi Peter Chiu,et al.  Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..

[8]  S. Viswanathan,et al.  Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..

[9]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[10]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[11]  Steven Nahmias,et al.  Production and operations analysis , 1992 .

[12]  Yigal Gerchak,et al.  Multistage Production to Order with Rework Capability , 2002, Manag. Sci..

[13]  Bhaba R. Sarker,et al.  Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..

[14]  B. Sarker,et al.  Economic manufacturing quantity in a just-in-time delivery system , 1992 .

[15]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[16]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[17]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[18]  Ronald L. Rardin,et al.  Optimization in operations research , 1997 .

[19]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[20]  Singa Wang Chiu,et al.  Effect of shortage level constraint on finite production rate model with rework , 2008 .

[21]  Roger M. Hill Optimizing a Production System with a Fixed Delivery Schedule , 1996 .

[22]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[23]  M. Hariga,et al.  Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .

[24]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[25]  Morton J. M. Posner,et al.  Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..

[26]  Bhaba R. Sarker,et al.  Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries , 2006, Comput. Oper. Res..

[27]  M Sheykh Sajadieh,et al.  OPTIMIZING A JOINT ECONOMIC LOT SIZING PROBLEM WITH PRICE-SENSITIVE DEMAND , 2009 .

[28]  Gyana R. Parija,et al.  An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .

[29]  C.-Y. Tseng,et al.  Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy , 2009 .