Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues
暂无分享,去创建一个
M.-F. Wu | S. W. Chiu | H.-D. Lin | J.-Ch. Yang | S. Chiu | H.-D. Lin | M-F. Wu | J.-Ch. Yang
[1] Tonya Boone,et al. The Impact of Imperfect Processes on Production Run Times , 2000, Decis. Sci..
[2] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[3] Bong Jin Yum,et al. Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .
[4] Tadashi Dohi,et al. Minimal repair policies for an economic manufacturing process , 1998 .
[5] Amir Abbas Najafi,et al. ECONOMIC PRODUCTION QUANTITY MODEL WITH SCRAPPED ITEMS AND LIMITED PRODUCTION CAPACITY , 2010 .
[6] Ruhul A. Sarker,et al. An optimal batch size for a production system operating under periodic delivery policy , 1999 .
[7] Yuan-Shyi Peter Chiu,et al. Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..
[8] S. Viswanathan,et al. Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..
[9] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[10] A. Seidmann,et al. Production lot sizing with machine breakdowns , 1992 .
[11] Steven Nahmias,et al. Production and operations analysis , 1992 .
[12] Yigal Gerchak,et al. Multistage Production to Order with Rework Capability , 2002, Manag. Sci..
[13] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[14] B. Sarker,et al. Economic manufacturing quantity in a just-in-time delivery system , 1992 .
[15] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[16] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[17] Marvin Zelen,et al. Mathematical Theory of Reliability , 1965 .
[18] Ronald L. Rardin,et al. Optimization in operations research , 1997 .
[19] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[20] Singa Wang Chiu,et al. Effect of shortage level constraint on finite production rate model with rework , 2008 .
[21] Roger M. Hill. Optimizing a Production System with a Fixed Delivery Schedule , 1996 .
[22] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[23] M. Hariga,et al. Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .
[24] Singa Wang Chiu,et al. Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .
[25] Morton J. M. Posner,et al. Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..
[26] Bhaba R. Sarker,et al. Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries , 2006, Comput. Oper. Res..
[27] M Sheykh Sajadieh,et al. OPTIMIZING A JOINT ECONOMIC LOT SIZING PROBLEM WITH PRICE-SENSITIVE DEMAND , 2009 .
[28] Gyana R. Parija,et al. An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .
[29] C.-Y. Tseng,et al. Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy , 2009 .