Influence of the Monitoring and Control Strategies of Indigenous and Expatriate Nigerian Contractors on Project Outcome

Monitoring and control are very important management functions for ensuring that project objectives are fully achieved. This study compares the level and effectiveness of the efforts of indigenous and expatriate Nigerian contractors on project monitoring and control. The aim of this study is to establish whether the project monitoring and control efforts of the contractors contribute to an improved project outcome. The study's objectives are to compare the frequencies at which project monitoring and control strategies are used by Nigerian contractors and their influence on project outcome. A field survey was conducted using a sample of 86 contractors selected by stratified random sampling. The data were collected using structured questionnaires and analysed using the mean, t-test and Spearman correlation test. The results of the study reveal that indigenous contractors carry out project control strategies more frequently than expatriate contractors. Furthermore, three of the eight monitoring and control strategies influence the project outcome, while the remaining strategies do not; this result indicates that while some of the strategies are effective, others are not. Contractors should thus ensure that their project monitoring and control efforts are directed towards improving the entire outcomes of their projects.

[1]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[2]  George J. Ritz Total Construction Project Management , 1993 .

[3]  Jeffrey D. Kursave The necessity of project schedule updating/monitoring/statusing , 2003 .

[4]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[5]  Augustine Uche Elinwa,et al.  Time-Overrun Factors in Nigerian Construction Industry , 2001 .

[6]  R. Anthony,et al.  Planning and Control Systems: A Framework for Analysis , 1965 .

[7]  Godwin Iroroakpo Idoro,et al.  Influence of quality performance on clients’ patronage of indigenous and expatriate construction contractors in Nigeria , 2010 .

[8]  Adnan Enshassi A monitoring and controlling system in managing infrastructure projects , 1996 .

[9]  Swaziland Second national development plan, 1973-1977 , 1972 .

[10]  David Arditi Construction Productivity Improvement , 1985 .

[11]  Florence Yean Yng Ling,et al.  Predicting Performance of Design-Build and Design-Bid-Build Projects , 2004 .

[12]  Gianfranco Dioguardi,et al.  Macrofirms: Construction Firms for the Computer Age , 1983 .

[13]  A. Uchechukwu Elinwa,et al.  Construction Cost Factors in Nigeria , 1993 .

[14]  Paul Bowen,et al.  Stakeholder Perceptions of Contractor Time, Cost and Quality Management on Building Projects , 2007 .

[15]  George S. Odiorne,et al.  Management by Objectives , 1970 .

[16]  Botswana National development plan , 1968 .

[17]  Janine Nahapiet,et al.  A comparison of contractual arrangements for building projects , 1985 .

[18]  Olusegun O. Faniran,et al.  INTERACTIONS BETWEEN CONSTRUCTION PLANNING AND INFLUENCE FACTORS , 1998 .