Flexible flow shop equipment utilization rate with time window constraints scheduling optimization problems
暂无分享,去创建一个
Zhonghua Han | Zhe Lv | Yue Sun | Xiaoting Dong | Ce Xu
[1] Hongchang Zhang,et al. Cyclic Scheduling of Flexible Job-shop with Time Window Constraints and Resource Capacity Constraints , 2015 .
[2] Rolando Quintero,et al. Hardware implementation of the elitist compact Genetic Algorithm using Cellular Automata pseudo-random number generator , 2013, Comput. Electr. Eng..
[3] Qingfu Zhang,et al. Guidelines for developing effective Estimation of Distribution Algorithms in solving single machine scheduling problems , 2010, Expert Syst. Appl..
[4] Haibo Shi,et al. Cost Optimization Problem of Hybrid Flow-Shop Based on PSO Algorithm , 2012 .
[5] David E. Goldberg,et al. The compact genetic algorithm , 1999, IEEE Trans. Evol. Comput..
[6] Haibo Shi,et al. Time-window-based combined objective DE algorithm for hybrid flow-shop , 2014, Int. J. Model. Identif. Control..
[7] Alexandre C. B. Delbem,et al. Programmable logic design of a compact Genetic Algorithm for phasor estimation in real-time , 2014 .
[8] Ju-Jang Lee,et al. Compact Genetic Algorithms using belief vectors , 2011, Appl. Soft Comput..
[9] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[10] Fardin Ahmadizar,et al. A hybrid algorithm to minimize makespan for the permutation flow shop scheduling problem , 2010, Int. J. Comput. Intell. Syst..
[11] 韩忠华,et al. Time-window-based combined objective DE algorithm for hybrid flow-shop , 2014 .