The Role of Automation in Right-time Construction Safety

Construction organizations continue to be challenged to adequately prevent accidents. Although the five C's (culture, competency, communication, controls, and contractors) have been focusing for many years on compliance, good practices, and best in class strategies, even industry leaders have only marginal improvements in recorded safety statistics. Right-time vs. real-time construction safety and health identifies three major focus areas to aid in the development of a strategic – as opposed to a tactical – response. (1) Occupational safety and health by design, (2) real-time safety and health monitoring and alerts, and (3) education, training, and feedback leveraging state-of-the-art technology provide meaningful predictive, quantitative, and qualitative measures to identify, correlate, and eliminate hazards before workers get injured or incidents cause collateral damage. Based on the current state-of-the-art of existing innovative initiatives in the occupational construction safety and health domain, a framework for right-time vs. real-time construction safety and health presents the specific focus on assisted safety and health data gathering, analysis and reporting to achieve a better safety performance. The practical as well as social implications in conducting a rigorous right-time safety culture in a construction business and its entire supply chain are tested in selected application scenarios and results are presented.

[1]  Tariq S. Abdelhamid,et al.  Identifying Root Causes of Construction Accidents , 2001 .

[2]  Jochen Teizer,et al.  Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA) , 2015 .

[3]  Charles M. Eastman,et al.  Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning , 2015 .

[4]  Jochen Teizer,et al.  Right-time vs real-time pro-active construction safety and health system architecture , 2016 .

[5]  Nick Blismas,et al.  Would the time-delay of safety data matter? real-time active safety system (RASS) for construction industry , 2014 .

[6]  Jimmie Hinze,et al.  Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system , 2010 .

[7]  Xiaochun Luo,et al.  A field experiment of workers' responses to proximity warnings of static safety hazards on construction sites , 2016 .

[8]  Carlos H. Caldas,et al.  Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources , 2007 .

[9]  Rafael Sacks,et al.  Assessing research issues in Automated Project Performance Control (APPC) , 2007 .

[10]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .

[11]  Frank Boukamp,et al.  The development of an automated multi-level safety climate benchmarking tool for construction projects , 2014 .

[12]  H. W. Heinrich,et al.  Industrial Accident Prevention: a Scientific Approach , 1951 .

[13]  Helen Lingard,et al.  "If you cannot measure it, you cannot improve it": Measuring health and safety performance in the construction industry , 2013 .

[14]  Carlos T. Formoso,et al.  A Human Error Perspective of Safety Planning and Control , 2004 .

[15]  Charles M. Eastman,et al.  BIM-based fall hazard identification and prevention in construction safety planning , 2015 .

[16]  Linda J. Bellamy,et al.  Exploring the relationship between major hazard, fatal and non-fatal accidents through outcomes and causes , 2015 .

[17]  Tao Cheng,et al.  Proximity hazard indicator for workers-on-foot near miss interactions with construction equipment and geo-referenced hazard areas , 2015 .

[18]  Jochen Teizer,et al.  Automated Collection, Identification, Localization, and Analysis of Worker-Related Proximity Hazard Events in Heavy Construction Equipment Operation , 2015 .

[19]  Johnny Dyreborg,et al.  The causal relation between lead and lag indicators , 2009 .

[20]  Gregory A. Howell,et al.  Systems Model of Construction Accident Causation , 2005 .

[21]  Tao Cheng,et al.  Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity , 2013 .