U-OPT: An analysis of exact U-shaped line balancing procedures

The U-shaped assembly line-balancing problem can be solved using optimization procedures or algorithms, including branch-and-bound procedures. This paper considers design elements that should be included in these solution methods for solving the U-shaped assembly line-balancing problem. New solution procedures are proposed and compared experimentally with several existing procedures using a variety of problem sets from the literature. The results show that the substantial improvement in the efficacy of the new solution procedures over existing methods is due primarily to the newly developed 'Paired Tasks' lower bound. Results also show the relative importance of various design elements comprising a branch-and-bound procedure.

[1]  Michael J. Magazine,et al.  Assembly line balancing as generalized bin packing , 1982, Oper. Res. Lett..

[2]  William V. Gehrlein On methods for generating random partial orders , 1986 .

[3]  Roger V. Johnson EFFICIENT MODULAR IMPLEMENTATION OF BRANCH‐AND‐BOUND ALGORITHMS* , 1988 .

[4]  Thomas R. Hoffmann Assembly Line Balancing with a Precedence Matrix , 1963 .

[5]  Ezey M. Dar-El,et al.  MALB—A Heuristic Technique for Balancing Large Single-Model Assembly Lines , 1973 .

[6]  Ming Zhou,et al.  A parallel station heuristic for the mixed-model production line balancing problem , 1997 .

[7]  Hamilton David Sparling Topics in U-line balancing , 1997 .

[8]  James H. Patterson,et al.  An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem , 1984 .

[9]  John Miltenburg,et al.  U-shaped production lines: A review of theory and practice , 2001 .

[10]  J. Wijngaard,et al.  The U-line balancing problem , 1994 .

[11]  Linus Schrage,et al.  Dynamic Programming Solution of Sequencing Problems with Precedence Constraints , 1978, Oper. Res..

[12]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[13]  David Sparling Balancing Just-In-Time Production Units: The N U-Line Balancing Problem , 1998 .

[14]  Roger V. Johnson,et al.  Optimally balancing large assembly lines with `FABLE' , 1988 .

[15]  Edward R. Clayton,et al.  An Evolutionary Algorithm for Sequencing Production on a Paced Assembly Line , 2000, Decis. Sci..

[16]  Jaideep Motwani,et al.  The effect of straight- and U-shaped lines on quality , 2000, IEEE Trans. Engineering Management.

[17]  Armin Scholl,et al.  ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .

[18]  Steven T. Hackman,et al.  Fast, Effective Algorithms for Simple Assembly Line Balancing Problems , 1989, Oper. Res..

[19]  Mok-Kong Shen On the generation of permutations and combinations , 1962 .

[20]  A. Sprecher A competitive branch-and-bound algorithm for the simple assembly line balancing problem , 1999 .

[21]  Timothy L. Urban,et al.  Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .

[22]  A. A. Mastor,et al.  An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques , 1970 .

[23]  Tadeusz Sawik Balancing and scheduling of surface mount technology lines , 2002 .

[24]  Willy Herroelen,et al.  An optimal procedure for the single-model deterministic assembly line balancing problem , 1979 .

[25]  C. L. Moodie,et al.  A HEURISTIC METHOD OF ASSEMBLY LINE BALANCING FOR ASSUMPTIONS OF CONSTANTOR VARIABLE WORK ELEMENT TIMES , 1964 .

[26]  E. H. Bowman Assembly-Line Balancing by Linear Programming , 1960 .

[27]  J. Temple Black,et al.  The design of the factory with a future , 1991 .

[28]  John Miltenburg,et al.  The effect of breakdowns on U-shaped production lines , 2000 .

[29]  Alf Kimms,et al.  Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints , 2001, Manag. Sci..

[30]  John Miltenburg,et al.  The mixed-model U-line balancing problem , 1998 .

[31]  Soumen Ghosh,et al.  Assembly line research: Historical roots, research life cycles and future directions , 1991 .

[32]  Thomas R. Hoffman Eureka: a hybrid system for assembly line balancing , 1992 .

[33]  I. Winfield Japanese manufacturing techniques , 1994 .

[34]  John Miltenburg,et al.  Balancing U-lines in a multiple U-line facility , 1998, Eur. J. Oper. Res..

[35]  William V. Gehrlein,et al.  A comparative evaluation of heuristic line balancing techniques , 1986 .

[36]  Armin Scholl,et al.  Balancing assembly lines effectively - A computational comparison , 1999, Eur. J. Oper. Res..

[37]  A. L. Arcus,et al.  COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .

[38]  Marc J. Schniederjans,et al.  U-shaped assembly line layouts and their impact on labor productivity: An experimental study , 2004, Eur. J. Oper. Res..