Methods for job configuration in semiconductor manufacturing
暂无分享,去创建一个
[1] Roy E. Welsch,et al. Sequential Screening in Semiconductor Manufacturing, I: Exploiting Spatial Dependence , 1996, Oper. Res..
[2] David D. Yao,et al. A queueing network model for semiconductor manufacturing , 1996 .
[3] Lawrence M. Wein,et al. A Product Design Problem in Semiconductor Manufacturing , 1992, Oper. Res..
[4] Bennett Fox,et al. Discrete Optimization Via Marginal Analysis , 1966 .
[5] H. Robbins,et al. Maximally dependent random variables. , 1976, Proceedings of the National Academy of Sciences of the United States of America.
[6] Christopher S. Tang. Composing batches with yield uncertainty , 1993 .
[7] R. Akella,et al. Planning for production of a set of components when yield is random , 1988, Fifth IEEE/CHMT International Electronic Manufacturing Technology Symposium, 1988, 'Design-to-Manufacturing Transfer Cycle.
[8] Susan L. Albin,et al. The Impact of Clustered Defect Distributions in IC Fabrication , 1989 .
[9] Lawrence M. Wein,et al. Sequential Screening in Semiconductor Manufacturing, II: Exploiting Lot-to-Lot Variability , 1996, Oper. Res..