An integrated dispatching rule with on‐line rework consideration in wafer fabrication
暂无分享,去创建一个
[1] D. Y. Sha,et al. The integration of shop floor control in wafer fabrication , 2007 .
[2] John W. Fowler,et al. A new scheduling approach using combined dispatching criteria in wafer fabs , 2003 .
[3] Taeyong Yang,et al. A due-date based production control policy using WIP balance for implementation in semiconductor fabrications , 2008 .
[4] Ali M. Zargar,et al. Effect of rework strategies on cycle time , 1995 .
[5] Hyun Joong Yoon,et al. A control method to reduce the standard deviation of flow time in wafer fabrication , 2000 .
[6] Huiran Liu,et al. Modelling of semiconductor wafer fabrication systems by extended object-oriented Petri nets , 2005 .
[7] Fu-Kwun Wang,et al. Development of a state-dependent dispatch rule using theory of constraints in near-real-world wafer fabrication , 2002 .
[8] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[9] D. Y. Sha,et al. Wafer rework strategies at the photolithography stage , 2001 .
[10] Chao Qi,et al. Impact of Production Control and System Factors in Semiconductor Wafer Fabrication , 2008, IEEE Transactions on Semiconductor Manufacturing.
[11] Chun-Hung Chen,et al. Efficient Simulation-Based Composition of Scheduling Policies by Integrating Ordinal Optimization With Design of Experiment , 2007, IEEE Transactions on Automation Science and Engineering.
[12] Zhibin Jiang,et al. Simulation based real-time scheduling method for dispatching and rework control of semiconductor manufacturing system , 2007, 2007 IEEE International Conference on Systems, Man and Cybernetics.
[13] Lee Dong-Ho,et al. A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .
[14] Michael E. Kuhl,et al. A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication , 2008 .
[15] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[16] A. Barua,et al. Implementing global factory schedules in the face of stochastic disruptions , 2005 .
[17] Ling-Feng Hsieh,et al. STUDY ON WAFER REWORK STRATEGIES AND DISPATCHING RULES AT THE PHOTOLITHOGRAPHY STAGE , 2003 .
[18] D. Y. Sha,et al. The effects of rework on the shopfloor control in wafer fabrication , 2004 .
[19] P.R. Kumar. Scheduling semiconductor manufacturing plants , 1994, IEEE Control Systems.
[20] Mauricio G. C. Resende,et al. A scheduling rule for job release in semiconductor fabrication , 1988 .
[21] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[22] S.X.C. Lou,et al. A robust production control policy for VLSI wafer fabrication , 1989 .
[23] Zuhua Jiang,et al. The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab , 2007 .
[24] A. Upasani,et al. Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study , 2008 .