An integrated dispatching rule with on‐line rework consideration in wafer fabrication

Purpose – In wafer fabrication, the material cost of wafer is expensive. It is imperative to repair the defective wafers produced during the manufacturing process for reducing the cost and increasing the yield of wafer fabrication. However, repairing defective wafer will not only increase the work‐in‐process (WIP) level but the flow time of rework lots as well. In wafer fabrication, rework of wafer is only allowed in the photolithography area, where is the bottleneck of the entire wafer fab. The purpose of this paper is to develop a dispatching rule concerned with rework for photolithography area.Design/methodology/approach – The research developed a load‐oriented integrated rule, Re‐Disp, to consider the lots' sequencing decision and rework consideration at the photolithography area, in wafer fabrication. Simulation test and statistical analysis have been done on a virtual wafer fabrication plant. In the simulation model, some combinations of dispatching and rework rules, which are popular in practice, h...

[1]  D. Y. Sha,et al.  The integration of shop floor control in wafer fabrication , 2007 .

[2]  John W. Fowler,et al.  A new scheduling approach using combined dispatching criteria in wafer fabs , 2003 .

[3]  Taeyong Yang,et al.  A due-date based production control policy using WIP balance for implementation in semiconductor fabrications , 2008 .

[4]  Ali M. Zargar,et al.  Effect of rework strategies on cycle time , 1995 .

[5]  Hyun Joong Yoon,et al.  A control method to reduce the standard deviation of flow time in wafer fabrication , 2000 .

[6]  Huiran Liu,et al.  Modelling of semiconductor wafer fabrication systems by extended object-oriented Petri nets , 2005 .

[7]  Fu-Kwun Wang,et al.  Development of a state-dependent dispatch rule using theory of constraints in near-real-world wafer fabrication , 2002 .

[8]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[9]  D. Y. Sha,et al.  Wafer rework strategies at the photolithography stage , 2001 .

[10]  Chao Qi,et al.  Impact of Production Control and System Factors in Semiconductor Wafer Fabrication , 2008, IEEE Transactions on Semiconductor Manufacturing.

[11]  Chun-Hung Chen,et al.  Efficient Simulation-Based Composition of Scheduling Policies by Integrating Ordinal Optimization With Design of Experiment , 2007, IEEE Transactions on Automation Science and Engineering.

[12]  Zhibin Jiang,et al.  Simulation based real-time scheduling method for dispatching and rework control of semiconductor manufacturing system , 2007, 2007 IEEE International Conference on Systems, Man and Cybernetics.

[13]  Lee Dong-Ho,et al.  A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .

[14]  Michael E. Kuhl,et al.  A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication , 2008 .

[15]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[16]  A. Barua,et al.  Implementing global factory schedules in the face of stochastic disruptions , 2005 .

[17]  Ling-Feng Hsieh,et al.  STUDY ON WAFER REWORK STRATEGIES AND DISPATCHING RULES AT THE PHOTOLITHOGRAPHY STAGE , 2003 .

[18]  D. Y. Sha,et al.  The effects of rework on the shopfloor control in wafer fabrication , 2004 .

[19]  P.R. Kumar Scheduling semiconductor manufacturing plants , 1994, IEEE Control Systems.

[20]  Mauricio G. C. Resende,et al.  A scheduling rule for job release in semiconductor fabrication , 1988 .

[21]  Don T. Phillips,et al.  A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .

[22]  S.X.C. Lou,et al.  A robust production control policy for VLSI wafer fabrication , 1989 .

[23]  Zuhua Jiang,et al.  The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab , 2007 .

[24]  A. Upasani,et al.  Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study , 2008 .