Current practice in project management — an empirical study

This paper reports the findings of a survey designed to capture the ‘real world’ experiences of people active in project management. The survey took the form of a questionnaire that was sent to 995 Project Managers and which achieved a response rate of 23.7%. Each respondent was asked to describe a recent project and identify factors that were regarded as critical to that project's outcome. The extent to which the project gave rise to side-effects was explored and particular emphasis was placed on the use that had been made of any of the many project management methods, tools and techniques that are available. Respondents were also asked to judge the effectiveness of the methods, tools and techniques they had used and to report any limitations or drawbacks they had encountered. The results showed that most respondents used only a small number of methods, tools and techniques with project management software and Gantt charts being the most widely used aids. Almost half of the respondents reported drawbacks to the methods, tools and techniques they had employed. The criteria for judging project success most cited in the project management literature (on time; to budget; and to specification) were the criteria used by the respondents to judge their projects' success. However, two further criteria were reported as being of particular relevance. These were both concerned with the consequences of the project on the organisation involve. In contrast to the finding of many surveys of project success rates, a remarkably high proportion (41%) of the projects reported upon here were judged to be completely successful, though it should be noted that the judgements were made by Project Managers who had worked on the projects being judged.

[1]  Miley W. Merkhofer,et al.  Comparative Analysis of Formal Decision-Making Approaches , 1986 .

[2]  Jinjoo Lee,et al.  Factors influencing the success of management consulting projects , 1998 .

[3]  K. T. Yeo,et al.  Planning and learning in major infrastructure development: systems perspectives , 1995 .

[4]  William R. King,et al.  Project Management Handbook , 1983 .

[5]  J. Pinto,et al.  Lessons for an accidental profession , 1995 .

[6]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..

[7]  Richard G. Mathieu,et al.  Critical factors in information system development for a flexible manufacturing system , 1996 .

[8]  Telecommunications Agency,et al.  Introduction to the management of risk , 1993 .

[9]  D. Lucas Understanding the Human Factor in Disasters , 1992 .

[10]  John Wateridge,et al.  IT projects: a basis for success , 1995 .

[11]  Leslie P. Willcocks,et al.  Risk assessment and information systems , 1993, ECIS.

[12]  B Wahlström,et al.  Applications of probabilistic risk assessments: the selection of appropriate tools. , 1991, Risk analysis : an official publication of the Society for Risk Analysis.

[13]  Hugh J. Watson,et al.  Critical Success Factors for Information Center Managers , 1988, MIS Q..

[14]  David Baldry,et al.  The evaluation of risk management in public sector capital projects , 1998 .

[15]  P Morris,et al.  Research at Oxford into the Preconditions of Success and Failure in Major Projects , 1986 .

[16]  Trevor Kletz Critical Aspects Of Safety And Loss Prevention , 1990 .

[17]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[18]  Robert N. Charette,et al.  Large-Scale Project Management Is Risk Management , 1996, IEEE Softw..

[19]  Michael P. Hottenstein,et al.  Managing Risk in Advanced Manufacturing Technology , 1992 .

[20]  Leslie P. Willcocks,et al.  Predicting risk of failure in large-scale Information Technology projects , 1994 .

[21]  D. Partington The project management of organizational change , 1996 .

[22]  D. Buss,et al.  Contemporary Worldviews and Perception of the Technological System , 1986 .

[23]  Liliane Pintelon,et al.  Book reviewRisk: Analysis, assessment and management: Wiley, Chichester, 1992, 220 pages, £24.95 , 1994 .

[24]  J. Coppendale Manage risk in product and process development and avoid unpleasant surprises , 1995 .

[25]  William R. King,et al.  Systems analysis and project management , 1983 .

[26]  Vipul K. Gupta,et al.  Total Constructability Management: A Process Oriented Framework , 1995 .

[27]  R Max Wideman Criteria for a project-management body of knowledge , 1995 .

[28]  Jeffrey K. Pinto,et al.  Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.

[29]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .