Mid Long Term Optimized Dispatching of Virtual Power Plant Based on Weighted Kilowatt Hour Battery Loss Model
暂无分享,去创建一个
[1] Xu Jin-gen. RECONSTRUCTION SEQUENCE ALGORITHM FOR REPLACING OVERHEAD LINES BY UNDERGROUND CABLES BASED ON PRIORITY WEIGHTS METHOD , 2004 .
[2] Z. Vale,et al. Distributed generation and demand response dispatch for a virtual power player energy and reserve provision , 2014 .
[3] Jean Kumagai. Virtual power plants, real power , 2012 .
[4] Jong-Hwan Kim,et al. Genetic quantum algorithm and its application to combinatorial optimization problem , 2000, Proceedings of the 2000 Congress on Evolutionary Computation. CEC00 (Cat. No.00TH8512).
[5] J. Oyarzabal,et al. A Direct Load Control Model for Virtual Power Plant Management , 2009, IEEE Transactions on Power Systems.
[6] Xia Fei. Orbit Purification of Generator Units Based on a New Generalized Particle Swarm Optimization Method , 2012 .
[7] M. Shahidehpour,et al. Risk-Constrained Coordination of Cascaded Hydro Units With Variable Wind Power Generation , 2012, IEEE Transactions on Sustainable Energy.