Effect of time resolution on unit commitment decisions in systems with high wind penetration

The increasing share of wind power in power systems requires changes in the operating procedures. Day-ahead scheduling no longer has to fit only with slow and easily predictable changes in load, but also with more abrupt changes in wind power. Procedures for dealing with wind uncertainty, such as stochastic, robust, and interval unit commitment algorithms, typically assume a one-hour resolution. Since wind generation can change significantly within an hour, shorter optimization intervals might be required to adequately reflect this uncertainty. This paper compares the stochastic, interval and robust unit commitment formulations with resolutions of 1 hour and 15 minutes. The schedules produced by these various algorithms are compared using a Monte Carlo simulation procedure on a modified version of the 24-bus IEEE-RTS.

[1]  Hein Putter,et al.  The bootstrap: a tutorial , 2000 .

[2]  Daniel S. Kirschen,et al.  Assessing the Impact of Wind Power Generation on Operating Costs , 2010, IEEE Transactions on Smart Grid.

[3]  F. Bouffard,et al.  Intra-hour wind power characteristics for flexible operations , 2012, 2012 IEEE Power and Energy Society General Meeting.

[4]  N. Cox Statistical Models in Engineering , 1970 .

[5]  Mohammad Shahidehpour,et al.  Security-constrained unit commitment with volatile wind power generation , 2009, 2009 IEEE Power & Energy Society General Meeting.

[6]  P. Meibom,et al.  A Stochastic Unit-commitment Model for the Evaluation of the Impacts of Integration of Large Amounts of Intermittent Wind Power , 2006, 2006 International Conference on Probabilistic Methods Applied to Power Systems.

[7]  Jian Ma,et al.  Operational Impacts of Wind Generation on California Power Systems , 2009, IEEE Transactions on Power Systems.

[8]  M. O'Malley,et al.  Unit Commitment for Systems With Significant Wind Penetration , 2009, IEEE Transactions on Power Systems.

[9]  Kevin P. Murphy,et al.  Machine learning - a probabilistic perspective , 2012, Adaptive computation and machine learning series.

[10]  Daniel S. Kirschen,et al.  Comparison of state-of-the-art transmission constrained unit commitment formulations , 2013, 2013 IEEE Power & Energy Society General Meeting.

[11]  Yang Wang,et al.  Unit Commitment With Volatile Node Injections by Using Interval Optimization , 2011, IEEE Transactions on Power Systems.

[12]  Xu Andy Sun,et al.  Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem , 2013, IEEE Transactions on Power Systems.

[13]  Xin Sun,et al.  Interval mixed-integer programming for daily unit commitment and dispatch incorporating wind power , 2010, 2010 International Conference on Power System Technology.

[14]  A. Conejo,et al.  Scenario Reduction for Futures Market Trading in Electricity Markets , 2009, IEEE Transactions on Power Systems.

[15]  David L. Woodruff,et al.  Toward scalable, parallel progressive hedging for stochastic unit commitment , 2013, 2013 IEEE Power & Energy Society General Meeting.

[16]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .