Analysis of interrelationships among excavator productivity modifying factors

Purpose - – Excavator productivity calculations embrace myriad variables, which in turn, can be modelled in several ways. A key productivity variable is operator competence ( Design/methodology/approach - – A numeric, theoretical analysis is undertaken using the Caterpillar® hydraulic excavator productivity model to estimate excavator production, given: first, variance in modifying factors based on derived maximum and minimum values; and second, variance resulting from linear calculations based on excavator operator competence. Findings - – Excavator productivity resulting from incremental variance of modifying factors in isolation is shown to be linear except, in the case of bucket payload. Simultaneous application of modifying variables results in a greater, curvilinear productivity trend; while it is demonstrated that quantification of key modifying factors can to a significant extent be related to operator competence. Research limitations/implications - – Findings add to productivity literature generally and to that of plant and equipment more specifically. Results will help productivity estimation of excavation in a practical sense while informing subsequent design of an empirical academic research of this problem. Originality/value - – Originality relates principally to determining modifying factor ranges and their analysis of simultaneous effect on each other, especially, as influenced on assumptions of operator competence.

[1]  V. Salas-Fumás,et al.  Learning to learn and productivity growth: evidence from a new car-assembly plant , 2013 .

[2]  Pierre Ackerman,et al.  Excavator-based processor operator productivity and cost analysis in Zululand, South Africa , 2011 .

[3]  David J. Edwards,et al.  Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture , 2011 .

[4]  John-Paris Pantouvakis,et al.  Comparative analysis of operational coefficients' impact on excavation operations , 2010 .

[5]  Krzysztof Schabowicz,et al.  Estimation of earthworks execution time cost by means of artificial neural networks , 2010 .

[6]  Osama Moselhi,et al.  Optimization of Earthmoving Operations in Heavy Civil Engineering Projects , 2009 .

[7]  David J. Edwards,et al.  Construction plant and equipment management research: thematic review , 2009 .

[8]  S. A. Hosseini,et al.  Physical soil properties and slope treatments effects on hydraulic excavator productivity for forest road construction. , 2008, Pakistan journal of biological sciences : PJBS.

[9]  Carlos H. Caldas,et al.  Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources , 2007 .

[10]  Leonhard E. Bernold Quantitative Assessment of Backhoe Operator Skill , 2007 .

[11]  Kyung In Kang,et al.  A case-based reasoning cost estimating model using experience by analytic hierarchy process , 2007 .

[12]  Peter E.D. Love,et al.  Establishing the link between plant operator performance and personal motivation , 2007 .

[13]  Krzysztof Schabowicz,et al.  MATHEMATICAL-NEURAL MODEL FOR ASSESSING PRODUCTIVITY OF EARTHMOVING MACHINERY , 2007 .

[14]  Sunil K. Sinha,et al.  Construction equipment productivity estimation using artificial neural network model , 2006 .

[15]  Peter E.D. Love,et al.  Intelligence and maintenance proficiency: an examination of plant operators , 2005 .

[16]  Kris G. Mattila,et al.  Determination of Haul Distance and Direction in Mass Excavation , 2005 .

[17]  Leonhard E. Bernold,et al.  Comparative Performance Evaluation of Tele-Operated Pipe Laying , 2003 .

[18]  C. M. Tam,et al.  Artificial neural networks model for predicting excavator productivity , 2002 .

[19]  David J. Edwards,et al.  An artificial intelligence approach for improving plant operator maintenance proficiency , 2002 .

[20]  David J. Edwards,et al.  Maintenance skills training of UK construction plant operatives: a pilot survey , 2002 .

[21]  David J. Edwards,et al.  Quantifying the Cost of Plant Operators' Productivity , 2001 .

[22]  Hugh Durrant-Whyte,et al.  Impedance control of a hydraulically actuated robotic excavator , 2000 .

[23]  David J. Edwards,et al.  ESTIVATE: a model for calculating excavator productivity and output costs , 2000 .

[24]  Simon Smith,et al.  Earthmoving productivity estimation using linear regression techniques , 1999 .

[25]  Carl T. Haas,et al.  CONTROL IMPROVEMENT FOR ADVANCED CONSTRUCTION EQUIPMENT , 1998 .

[26]  Alexander M. Goulielmos,et al.  The man‐machine interface and its impact on shipping safety , 1997 .

[27]  Michael Forde,et al.  Analysis of earth-moving systems using discrete-event simulation , 1995 .

[28]  David J. Pratt Fundamentals of Construction Estimating , 1995 .

[29]  L. Eriksson,et al.  A Model for Predicting Productivity in Subgrade Preparation of Forest Roads by Excavator , 1989 .