Evaluating the impact of operating environments on MRP system nervousness
暂无分享,去创建一个
[1] Dean H. Kropp,et al. A comparison of strategies to dampen nervousness in MRP systems , 1986 .
[2] James D. Culley,et al. Computer Augmented Cases in Operations and Logistics Management , 1973 .
[3] Donald F. Morrison,et al. Applied linear statistical methods , 1983 .
[4] Roberta J Minifie,et al. Survey of MRP nervousness issues , 1986 .
[5] C. Jones. An Economic Evaluation of Job Shop Dispatching Rules , 1973 .
[6] R. C. Carlson,et al. Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .
[7] Alan J. Mayne,et al. Introduction to Simulation and SLAM , 1979 .
[8] Richard James Penlesky. Open order rescheduling for MRP systems in manufacturing firms , 1982 .
[9] E. Silver. Inventory control under a probabilistic time-varying, demand pattern , 1978 .
[10] Thomas G. Schmitt. Resolving uncertainty in manufacturing systems , 1984 .
[11] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .