Change Priority Determination in IT Service Management Based on Risk Exposure

In the Change Management process within IT Service Management, some activities need to evaluate the risk exposure associated with changes to be made to the infrastructure and services. The paper presents a method to evaluate risk exposure associated with a change. Further, we show how to use the risk exposure metric to automatically assign priorities to changes. The formal model developed for this purpose captures the business perspective by using financial metrics in the evaluation of risk. Thus the method is an example of Business-Driven IT Management. A case study, performed in conjunction with a large IT service provider, is reported and provides good results when compared to decisions made by human managers.

[1]  Claudio Bartolini,et al.  A decision support tool to optimize scheduling of IT changes , 2007, 2007 10th IFIP/IEEE International Symposium on Integrated Network Management.

[2]  S. P. Mosier,et al.  The relationship of technology change management to risk management , 2000, Proceedings of the 2000 IEEE Engineering Management Society. EMS - 2000 (Cat. No.00CH37139).

[3]  John M. Wilson,et al.  An Algorithm for the Generalized Assignment Problem with Special Ordered Sets , 2005, J. Heuristics.

[4]  S. P. Mosier,et al.  8.3.4 The Relationship of Technology Change Management to Risk Management , 2000 .

[5]  Glyn A. Holton Value at Risk: Theory and Practice , 2003 .

[6]  Jacques Philippe Sauvé,et al.  On the Risk Exposure and Priority Determination of Changes in IT Service Management , 2007, DSOM.

[7]  Joseph L. Hellerstein,et al.  A model of configuration complexity and its application to a change management system , 2005, 2005 9th IFIP/IEEE International Symposium on Integrated Network Management, 2005. IM 2005..

[8]  John Haigh,et al.  Probabilistic Risk Analysis: Foundations and Methods , 2003 .

[9]  Claudio Bartolini,et al.  Business Driven Prioritization of Service Incidents , 2004, DSOM.

[10]  Virgílio A. F. Almeida,et al.  Business-oriented resource management policies for e-commerce servers , 2000, Perform. Evaluation.

[11]  Kun-Lung Wu,et al.  The CHAMPS system: change management with planning and scheduling , 2004, 2004 IEEE/IFIP Network Operations and Management Symposium (IEEE Cat. No.04CH37507).