Fuzzy Gupta Scheduling for Flow Shops with More than two Machines
暂无分享,去创建一个
[1] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[2] S. Chanas,et al. Real-valued flows in a network with fuzzy arc capacities , 1984 .
[3] H. Zimmermann,et al. Fuzzy Set Theory and Its Applications , 1993 .
[4] C. Klein. Fuzzy shortest paths , 1991 .
[5] Mitsuo Gen,et al. An efficient approach for large scale project planning based on fuzzy Delphi method , 1995, Fuzzy Sets Syst..
[6] F. Skov,et al. Rule-based expert system. , 1990 .
[7] Tzung-Pei Hong,et al. Fuzzy scheduling on two-machine flow shop , 1998, J. Intell. Fuzzy Syst..
[8] Hiroaki Ishii,et al. One machine scheduling problem with fuzzy duedates , 1994 .
[9] Glenn Shafer,et al. Implementing Dempster's Rule for Hierarchical Evidence , 1987, Artif. Intell..
[10] Li-Xin Wang,et al. A Course In Fuzzy Systems and Control , 1996 .
[11] E. Lee,et al. Job sequencing with fuzzy processing times , 1990 .
[12] Thomas E. Morton,et al. Heuristic scheduling systems : with applications to production systems and project management , 1993 .
[13] Piero Risoluti. Fuzzy Sets, Decision Making, and Expert Systems , 2004 .
[14] Peter J. Denning,et al. Operating Systems Theory , 1973 .
[15] E. Lee,et al. Project network analysis with fuzzy activity times , 1988 .
[16] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[17] S. H. Nasution. Fuzzy Critical Path Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..
[18] L. Darrell Whitley,et al. The Traveling Salesrep Problem, Edge Assembly Crossover, and 2-opt , 1998, PPSN.
[19] Tzung-Pei Hong,et al. LPT scheduling for fuzzy tasks , 1998, Fuzzy Sets Syst..