Performance of Coupled Closed-Loop Workstation Capacity Controls in a Multi-Workstation Production System
暂无分享,去创建一个
[1] Bernd Scholz-Reiter,et al. Throughput Time Control in Production Systems Supported by Neural Networks , 2000 .
[2] Neil A. Duffie,et al. Design and Analysis of Closed-Loop Capacity Control for a Multi-Workstation Production System , 2005 .
[3] Bernd Scholz-Reiter,et al. Modelling Dynamics of Autonomous Logistic Processes: Discrete-event versus Continuous Approaches , 2005 .
[4] G. N. Evans,et al. Analysis and design of an adaptive minimum reasonable inventory control system , 1997 .
[5] Peter Nyhuis,et al. Applying Simulation and Analytical Models for Logistic Performance Prediction , 2005 .
[6] Günter Pritschow,et al. Application of Control Theory for Production Logistics – Results of a Joint Project , 1995 .
[7] Jan-Wilhelm Breithaupt,et al. Automatic production control applying control theory , 2000 .