An IEC 61850 Synchronised Event Logger for Substation Topology Processing

Abstract Substation automation systems consist of intelligent electronic devices (IEDs), substation computers, and the communication network between them for implementing control, protection and monitoring tasks in substations. This paper presents a topology processing technique that uses substation event information captured from legacy IEDs using a logging device. Such a device accurately translates the IEDs’ process-level control signals into a binary data representation using non-intrusive current transducers. The data is then transmitted using Generic Object Oriented Substation Event message format, which is defined in the latest substation communication standard IEC 61850. The device also implements IEEE 1588 standard to provide synchronised time-stamp values for each translated binary data within sub-microsecond accuracy. The event data obtained by using the logger on legacy IEDs is combined with data obtained directly from IEC 61850 compliant IEDs in processing the real-time substation topology. The proposed system could overcome existing problems of supervisory control and data acquisition systems, such as inaccurate timing information of substation events and unreliable topology processing in presence of bad data. Preliminary test results that demonstrate the operation of the new system are presented in the paper.

[1]  John C. Eidson,et al.  Measurement, Control, and Communication Using IEEE 1588 (Advances in Industrial Control) , 2006 .

[2]  Wolfgang Wimmer,et al.  Use of distributed topology detection for applications in Substation automation , 2009, 2009 IEEE Bucharest PowerTech.

[3]  Kang Lee,et al.  IEEE 1588 standard for a precision clock synchronization protocol for networked measurement and control systems , 2002, 2nd ISA/IEEE Sensors for Industry Conference,.

[4]  J. D. Huddleston,et al.  Summary of relay trip circuit design. A summary of an IEEE special publication by the PSRC Relay Trip Circuit Design WG , 2000, 2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134).

[5]  M. Kezunovic,et al.  Robust topology determination based on additional substation data from IEDs , 2005, 2005 IEEE Russia Power Tech.

[6]  Ali Abur,et al.  Data integration/exchange - Part 1: existing technical and business opportunities , 2004 .

[7]  A. Apostolov,et al.  Functional Testing of IEC 61850 Based Protection Relays , 2007, 2007 60th Annual Conference for Protective Relay Engineers.

[8]  Hans Weibel,et al.  Implementation and performance of time stamping techniques , 2004 .

[9]  Seung Jae Lee,et al.  A Bad Data Processing Algorithm for a Substation Automation System , 2006, 2006 8th International Conference on Actual Problems of Electronic Instrument Engineering.

[10]  M. Branicky,et al.  Design Considerations for Software Only Implementations of the IEEE 1588 Precision Time Protocol , 2005 .