Risk-informed decision-making related to the on-line maintenance
暂无分享,去创建一个
[1] Marko Cepin. The risk criteria for assessment of temporary changes in a nuclear power plant. , 2007, Risk analysis : an official publication of the Society for Risk Analysis.
[2] Peter Kafka,et al. Probabilistic Risk Assessment for Nuclear Power Plants , 2008 .
[3] A. Introduction. AN APPROACH FOR PLANT-SPECIFIC, RISK-INFORMED DECISIONMAKING: TECHNICAL SPECIFICATIONS , 2012 .
[4] Ana Sánchez,et al. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization , 2009, Reliab. Eng. Syst. Saf..
[5] Curtis Smith,et al. Calculating and addressing uncertainty for risk-based allowable outage times , 1999 .
[6] Sebastián Martorell,et al. Evaluation of allowed outage time considering a set of plant configurations , 2002, Reliab. Eng. Syst. Saf..
[7] A. Prošek,et al. The State-of-the-Art Theory and Applications of Best-Estimate Plus Uncertainty Methods , 2007 .
[8] P. K. Samanta,et al. Evaluation of risks associated with AOT and STI requirements at the ANO-1 nuclear power plant , 1988 .
[9] Sebastian Martorell,et al. Improving allowed outage time and surveillance test interval requirements: a study of their interactions using probabilistic methods , 1995 .
[10] Blas Galván,et al. Use of multiple objective evolutionary algorithms in optimizing surveillance requirements , 2006, Reliab. Eng. Syst. Saf..
[11] Kaisa Simola,et al. Decision criteria in PSA applications , 2001 .
[12] Victor F. Weisskopf,et al. Reactor safety study , 1976 .
[13] A. Introduction,et al. AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT- SPECIFIC CHANGES TO THE LICENSING BASIS , 2009 .