BESS LOCATED IN PRIMARY SUBSTATION FOR RES INTEGRATION AND ANCILLARY SERVICES PROVISION
暂无分享,去创建一个
[1] James L. Kirtley,et al. Energy storage for use in load frequency control , 2010, 2010 IEEE Conference on Innovative Technologies for an Efficient and Reliable Electricity Supply.
[2] Maurizio Delfanti,et al. Distributed Generation Integration in the Electric Grid: Energy Storage System for Frequency Control , 2014, J. Appl. Math..
[3] Maurizio Delfanti,et al. Changing the regulation for regulating the change: Innovation-driven regulatory developments for smart grids, smart metering and e-mobility in Italy , 2013 .
[4] Marco Merlo,et al. Battery energy storage system for primary control reserve and energy arbitrage , 2016 .
[5] James M. Eyer,et al. Benefit/cost framework for evaluating modular energy storage : a study for the DOE energy storage systems program. , 2008 .