Influence of process performance during the construction stage on achieving end‐project goals

Within a project environment, good process performance can be seen as indicative of eventual success of achieving end‐project goals. A model is proposed for identifying the links between process performance during construction and end‐project goals. The model is developed using process mapping technique to identify a number of process‐based key performance indicators (KPIs) designed for use in controlling process performance in the construction stage. These KPIs were then linked to generic project goals to measure the perceived degree of influence of process performance on the achievement of end‐project goals. The strength of these links within the model was established through a number of in‐depth interviews with respondents. Analysis of the results using methods of ranking and statistics has shown that some processes are perceived to have stronger relationships with the end‐project goals than others. The proposed process‐based KPIs hence offer an opportunity for control of the processes during the construction stage and eventually to influence the projects’ outcomes. In addition to the management of project time and cost, the model provides a broader focus of control that includes other multiple aspects such as the management of interactions between internal and external stakeholders as well as of information and quality management.

[1]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[2]  Xiaohua Jin,et al.  Relationship‐based determinants of building project performance in China , 2007 .

[3]  David K. H. Chua,et al.  Key determinants for construction schedule performance , 1999 .

[4]  Low Sui Pheng,et al.  Integrating buildability in ISO 9000 quality management systems: case study of a condominium project , 2001 .

[5]  Lauri Koskela,et al.  MANAGING THE THREE ASPECTS OF PRODUCTION IN CONSTRUCTION , 2002 .

[6]  A. Sousa-Poza,et al.  Project Management: A Cultural Literary Review , 2005 .

[7]  A. Akintoye,et al.  Risk analysis and management in construction , 1997 .

[8]  Theo Haupt,et al.  Key performance indicators and assessment methods for infrastructure sustainability—a South African construction industry perspective , 2007 .

[9]  Geert P.M.R. Dewulf,et al.  Process performance for control of project goals in construction , 2005 .

[10]  Refaat H. Abdel-Razek Quality Improvement in Egypt: Methodology and Implementation , 1998 .

[11]  Bent Flyvbjerg,et al.  Procedures for Dealing with Optimism Bias in Transport Planning , 2004 .

[12]  Raja R. A. Issa,et al.  Management’s Perception of Key Performance Indicators for Construction , 2003 .

[13]  Florence Yean Yng Ling,et al.  Key relationship-based determinants of project performance in China , 2006 .

[14]  M. G. Morgan,et al.  Risk analysis and management. , 1993, Scientific American.

[15]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[16]  Albert P.C. Chan,et al.  Key performance indicators for measuring construction success , 2004 .

[17]  Mario Vanhoucke Work Continuity Constraints in Project Scheduling , 2006 .

[18]  Liang Y Liu,et al.  Relationship between Project Interaction and Performance Indicators , 1996 .

[19]  Pwg Morris,et al.  Moving from Corporate Strategy to Project Strategy , 2005 .

[20]  David K. H. Chua,et al.  Model for Construction Budget Performance—Neural Network Approach , 1997 .

[21]  A. Akintoye,et al.  PERFORMANCE INDICATORS FOR SUCCESSFUL CONSTRUCTION PROJECT PERFORMANCE , 2005 .

[22]  Lauri Koskela,et al.  Context of Production Control in Construction , 2005 .

[23]  David Arditi,et al.  FACTORS THAT AFFECT PROCESS QUALITY IN THE LIFE CYCLE OF BUILDING PROJECTS , 1998 .

[24]  Albert P.C. Chan,et al.  Factors affecting the quality of building projects in Hong Kong , 2000 .

[25]  T. Thorpe,et al.  KPIs: a critical appraisal of their use in construction , 2004 .

[26]  J Davey Risk analysis and management. , 1991, Studies in health technology and informatics.

[27]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[28]  Steven Davis,et al.  Lessons Learnt in Developing Effective Performance Measures for Construction Safety Management , 2004 .

[29]  Jeffrey K. Pinto,et al.  Project Implementation Profile: a tool to aid project tracking and control , 1990 .

[30]  Karlos Artto,et al.  Managing projects front-end: incorporating a strategic early view to project management with simulation , 2001 .

[31]  Daniel Fong,et al.  Factors affecting safety performance on construction sites , 1999 .

[32]  Christine Pasquire,et al.  Drivers for dynamic brief development in construction , 2004 .

[33]  Stuart D. Anderson,et al.  Strategies for Achieving Excellence in Construction Safety Performance , 1996 .

[34]  Mohammed Fadhil Dulaimi,et al.  JOB BEHAVIOR OF CONSTRUCTION PROJECT MANAGERS: DETERMINANTS AND ASSESSMENT , 1999 .

[35]  A. Wong,et al.  Total quality management in the construction industry in Hong Kong: A supply chain management perspective , 1999 .

[36]  Sami Kärnä,et al.  Customer satisfaction in construction , 2004 .

[37]  Tarek Hegazy,et al.  Project performance control in reconstruction projects , 2000 .

[38]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[39]  Chimay J. Anumba,et al.  A Taxonomy for Communication Facets in Concurrent Life‐Cycle Design and Construction , 1999 .

[40]  Andrew William Brown,et al.  Measuring the effect of project management on construction outputs: a new approach , 2000 .

[41]  Douglas D. Gransberg,et al.  QUANTITATIVE ANALYSIS OF PARTNERED PROJECT PERFORMANCE , 1999 .

[42]  F. Ling How project managers can better control the performance of design-build projects , 2004 .

[43]  Khaled Nassar,et al.  Developing a complexity measure for project schedules , 2006 .

[44]  C. H. Lawshe A QUANTITATIVE APPROACH TO CONTENT VALIDITY , 1975 .

[45]  Miroslaw J. Skibniewski,et al.  Success/Failure Factors and Performance Measures of Web-Based Construction Project Management Systems: Professionals’ Viewpoint , 2006 .

[46]  Denis Thuillier,et al.  The success of international development projects, trust and communication: an African perspective , 2005 .

[47]  Eddie W.L. Cheng,et al.  Job Performance Dimensions for Improving Final Project Outcomes , 2007 .