Impact of Skilled Labor Availability on Construction Project Cost Performance
暂无分享,去创建一个
Paul M. Goodrum | Cidambi Srinivasan | Timothy R. B. Taylor | Gabriel B. Dadi | Hossein Karimi | C. Srinivasan | H. Karimi | G. Dadi
[1] Moshe Ben-Akiva,et al. TRANSFERABILITY AND UPDATING OF DISAGGREGATE TRAVEL DEMAND MODELS , 1976 .
[2] Moshe Ben-Akiva,et al. APPROACHES TO MODEL TRANSFERABILITY AND UPDATING: THE COMBINED TRANSFER ESTIMATOR , 1987 .
[3] Peter E.D. Love,et al. Quantifying the causes and costs of rework in construction , 2000 .
[4] Akintola Akintoye,et al. Analysis of factors influencing project cost estimating practice , 2000 .
[5] GERARD DE JONG,et al. National and International Freight Transport Models: An Overview and Ideas for Future Development , 2004 .
[6] Nina Karasmaa,et al. Evaluation of Transfer Methods for Spatial Travel Demand Models , 2007 .
[7] David N. Ford,et al. System Dynamics Applied to Project Management: A Survey, Assessment, and Directions for Future Research , 2007, System Dynamics.
[8] Hani M. Gharaibeh. Cost Control in Mega Projects Using the Delphi Method , 2014 .
[9] Paul M. Goodrum,et al. Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance , 2017 .
[10] David N. Ford,et al. Impact of Labour Controls on Tipping Point Dynamics in Large Complex Projects , 2018 .