Information technology in the development of the Polish construction industry
暂无分享,去创建一个
[1] Marcin Gajzler. Hybrid Advisory Systems and the Possibilities of IT Usage in the Process of Industrial Flooring Repairs , 2008 .
[2] Jerzy Pasławski,et al. Monitoring of construction processes in the variable environment , 2008 .
[3] Khaled Nassar,et al. Analysis of timed petri nets for reachability in construction applications , 2008 .
[4] Sérgio Scheer,et al. The necessary background for implementing and managing building design processes using web environments , 2007, J. Inf. Technol. Constr..
[5] Aleksandras Krylovas,et al. Mathematical modelling of forecasting the results of knowledge testing , 2008 .
[6] Oleg Kaplinski,et al. RELIABILITY OF COMPLEX PRODUCTION SYSTEMS , 1996 .
[7] E. Zavadskas,et al. Defining the utility and market value of a real estate: A multiple criteria approach , 2007 .
[8] Edmundas Kazimieras Zavadskas,et al. A New Logarithmic Normalization Method in Games Theory , 2008, Informatica.
[9] Brian Sloan,et al. Flexible Working in Scottish Local Authority Property: Developing a Combined Resource Management Strategy , 2008 .
[10] Edmundas Kazimieras Zavadskas,et al. The concept model of sustainable buildings refurbishment , 2008 .
[11] Edmundas Kazimieras Zavadskas,et al. SELECTION OF THE EFFECTIVE DWELLING HOUSE WALLS BY APPLYING ATTRIBUTES VALUES DETERMINED AT INTERVALS , 2008 .
[12] Algirdas Laukaitis,et al. Application of the program agent, that uses realty ontology, as the data source for the decision support system , 2007 .
[13] Oleg Kapliński,et al. Three phases of multifactor modelling of construction processes , 2006 .
[14] Olle Samuelson. The IT-barometer - a decade's development of IT use in the Swedish construction sector , 2008, J. Inf. Technol. Constr..
[15] Darius Migilinskas,et al. Complex usage of 4D information modelling concept for building design, estimation, sheduling and determination of effective variant , 2006 .
[16] Min-Yuan Cheng,et al. GIS‐based restoration system for historic timber buildings using RFID technology , 2008 .
[17] Tatsuo Arai,et al. Parts and packets unification radio frequency identification (RFID) application for construction , 2005 .
[18] Zenonas Turskis,et al. Multi‐attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique , 2008 .
[19] Sigitas Mitkus,et al. Modelling the process for defence of third party rights infringed while imp lementing construction investment projects , 2008 .
[20] Aleksandras Vytautas Rutkauskas,et al. Investment decisions modelling along sustainable development concept on financial markets , 2008 .
[21] Oleg Kapliński. Usefulness and credibility of scoring methods in construction industry , 2008 .
[22] Edmundas Kazimieras Zavadskas,et al. The knowledge presentation according to the needs of the participants in the public refurbishment sector , 2007 .
[23] Oleg Kaplinski,et al. IT Applications in Polish Construction Sector , 2008 .
[24] Min-Yuan Cheng,et al. Integrating barcode and GIS for monitoring construction progress , 2002 .
[25] O. Kaganova,et al. Introducing more transparent and efficient land management in post‐socialist cities: Lessons from Kyrgyzstan , 2008 .
[26] Jerzy Paslawski. Flexibility Implementation in Construction Process Engineering , 2008 .
[27] Jana Šelih. Environmental management systems and construction SMES: A case study for Slovenia , 2007 .
[28] Sigitas Mitkus,et al. Reasoned decisions in construction contracts evaluation , 2008 .
[29] Edmundas Kazimieras Zavadskas,et al. Multi‐objective decision‐making for road design , 2008 .
[30] O. Kapliński,et al. Catastrophic and strategic aspects of building processes balancing , 1992 .
[31] Marian Klasztorny,et al. Protection of suspension footbridges with tuned mass dampers against excessive resonant vertical vibrations caused by vandal pedestrian loads , 2007 .
[32] Krzysztof Schabowicz,et al. Neural identification of earthmoving machinery's productivity , 2007 .
[33] Charles Egbu,et al. Information technology tools for capturing and communicating learning and experiences in construction SMEs in developed and developing countires , 2007, J. Inf. Technol. Constr..
[34] Edmundas Kazimieras Zavadskas,et al. Multicriteria selection of project managers by applying grey criteria , 2008 .
[35] Tomasz Thiel,et al. Determination of the relative importance of criteria when the number of people judging is a small sample , 2008 .
[36] Aleksandras Vytautas Rutkauskas,et al. On the sustainability of regional competitiveness development considering risk , 2008 .
[37] Edmundas Kazimieras Zavadskas,et al. AN OVERVIEW OF THE PROBLEMS RELATED TO RESEARCH IN CONSTRUCTION ENGINEERING, MANAGEMENT AND ECONOMICS IN POLAND , 2002 .
[38] Andrzej Karzowski. Telemetric System for Management in Concrete Process , 2008 .
[39] J. Konior. Decision assumptions on building maintenance management. Probabilistic methods , 2007 .
[40] O. Kapliński,et al. Evaluation of multi-family housing systems in Poland , 1995 .
[41] Valentinas Podvezko,et al. A Feasibility Study of Multicriteria Methods’ Application to Quantitative Evaluation of Social Phenomena , 2008 .
[42] Eng. O. Kapliński DSc,et al. EXPERT SYSTEMS FOR CONSTRUCTION PROCESSES , 1997 .
[43] B. Hoła. Model of develpment tendency of accident situation in construction industry , 2006 .
[44] Oleg Kapliński,et al. CURRENT STATE AND PERSPECTIVES OF RESEARCH ON CONSTRUCTION MANAGEMENT AND MECHANISATION IN POLAND , 2002 .
[45] Edmundas Kazimieras Zavadskas,et al. Sustainable city compactness evaluation on the basis of GIS and bayes rule , 2006 .
[46] O. Kapliński. PHENOMENON OF INERTIA IN CONSTRUCTION INDUSTRY , 2001 .
[47] E. Marcinkowska,et al. Comparison of theoretical and practical research results concerning buildability of building external walls thermal overcladdings , 2007 .
[48] Oleg Kaplinski. Die Ausnutzung der Simulationstechnik zur Untersuchung und die Steuerung der Zuervlässigkeit von Produktionsprozessen im Bauwesen , 1985, Simulationstechnik.
[49] Oleg Kapliński,et al. Development and usefulness of planning techniques and decision‐making foundations on the example of construction enterprises in Poland , 2008 .
[50] Oleg Kapliński,et al. The application of multifactor model LITCAC in the organization of assembly work of flexible corrugated steel structures , 2006 .
[51] Dariusz Skorupka,et al. The method of identification and quantification of construction projects risk , 2005 .