Advances in multi-unit nuclear power plant probabilistic risk assessment

The Fukushima Dai-ichi accident highlighted the importance of risks from multiple nuclear reactor unit accidents at a site. As a result, there has been considerable interest in Multi-Unit Probabilistic Risk Assessment (MUPRA) in the past few years. For considerations in nuclear safety, the MUPRA estimates measures of risk and identifies contributors to risk representing the entire site rather than the individual units in the site. In doing so, possible unit-to-unit interactions and dependencies should be modeled and accounted for in the MUPRA. In order to effectively account for these risks, six main commonality classifications—initiating events, shared connections, identical components, proximity dependencies, human dependencies, and organizational dependencies—may be used. This paper examines advances in MUPRA, offers formal definitions of multi-unit site risk measures and proposes quantitative approaches and data to account for unit-to-unit dependencies. Finally, a parametric approach for the multi-unit dependencies has been discussed and a simple example illustrates application of the proposed methodology.

[1]  Tadakuni Hakata,et al.  Seismic PSA method for multiple nuclear power plants in a site , 2007, Reliab. Eng. Syst. Saf..

[2]  Mohammad Modarres,et al.  Framework for assessing integrated site risk of small modular reactors using dynamic Probabilistic Risk Assessment simulation , 2015 .

[3]  Ali Mosleh,et al.  Treating data uncertainties in common-cause failure analysis , 1989 .

[4]  Paolo Trucco,et al.  A Bayesian Belief Network modelling of organisational factors in risk analysis: A case study in maritime transportation , 2008, Reliab. Eng. Syst. Saf..

[5]  Mohammad Modarres,et al.  An event classification schema for evaluating site risk in a multi-unit nuclear power plant probabilistic risk assessment , 2013, Reliab. Eng. Syst. Saf..

[6]  Steven A. Arndt Methods and Strategies for Future Reactor Safety Goals , 2010 .

[7]  Joon-Eon Yang,et al.  A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants , 2003, Reliab. Eng. Syst. Saf..

[8]  Pekka Pyy,et al.  Probabilistic Risk Criteria and Safety Goals : NEA/CSNI/R(2009)16, OECD, Nuclear Energy Agency, Committee on the Safety of Nuclear Installations, Paris, 2009 , 2009 .

[9]  Aris Christou,et al.  Physics-based common cause failure modeling in probabilistic risk analysis: A mechanistic perspective , 2011 .

[10]  Bjørn Axel Gran,et al.  A Bayesian Belief Network for Reliability Assessment , 2001, SAFECOMP.

[11]  S. Kaplan,et al.  On The Quantitative Definition of Risk , 1981 .

[12]  A. Introduction,et al.  AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT- SPECIFIC CHANGES TO THE LICENSING BASIS , 2009 .