Knowledge-based scheduling of semiconductor testing operations
暂无分享,去创建一个
S. De | Chaiho Kim | A. Lee
[1] Anita Lee,et al. Flexible manufacturing system (FMS) scheduling using filtered beam search , 1990, J. Intell. Manuf..
[2] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[3] Anita Lee,et al. Flexible assembly scheduling using a knowledge-based approach , 1993 .