Optimising maintenance intervals for multiple maintenance policies: a cross-industrial study

An approach for the optimisation of maintenance intervals is introduced, incorporating several distinct elements. First of all, Weibull analysis provides a generalisable means to estimate reliability of non-repairable products. Next, an optimisation model has been developed that employs maintenance interval length to optimise for cost under specific reliability and operational constraints. These constraints are derived from historical data to assure validity of the method for assistance in practical maintenance decision-making. The developed approach accounts for different types of failure regimes and incorporates the main three maintenance policies identified in literature (failure, preventive, and predictive), in contrast to existing methods. The applicability of the developed approach has been tested in three case studies, each describing application and results for a different type of industry and associated product. The results notify the user on the optimum interval time for inspection, where costs are minimised within an acceptable reliability range.

[1]  Tiedo Tinga,et al.  Application of physical failure models to enable usage and load based maintenance , 2010, Reliab. Eng. Syst. Saf..

[2]  Harish Garg,et al.  Fuzzy Multiobjective Reliability Optimization Problem of Industrial Systems Using Particle Swarm Optimization , 2013 .

[3]  Min Xie,et al.  Weibull Distributions and Their Applications , 2006 .

[4]  Adel A. Ghobbar,et al.  Optimizing inspection intervals - Reliability and availability in terms of a cost model: A case study on railway carriers , 2013, Reliab. Eng. Syst. Saf..

[5]  John A. Buzacott,et al.  Equipment reliability and maintenance , 1985 .

[6]  Richard Curran,et al.  Concurrent Engineering and Integrated Aircraft Design , 2015 .

[7]  Kátia Lucchesi Cavalca,et al.  Maintenance resources optimization applied to a manufacturing system , 2006, Reliab. Eng. Syst. Saf..

[8]  James Lynch,et al.  Reliability, Maintainability and Supportability: A Probabilistic Approach , 1993 .

[9]  Andrew K. S. Jardine,et al.  A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data , 2009, Reliab. Eng. Syst. Saf..

[10]  Richard Curran,et al.  An evaluation of forecasting methods for aircraft non-routine maintenance material demand , 2014 .

[11]  Asit P. Basu,et al.  Statistical Methods for the Reliability of Repairable Systems , 2000 .

[12]  Zhigang Tian,et al.  Condition based maintenance optimization considering multiple objectives , 2009, Journal of Intelligent Manufacturing.

[13]  Tiedo Tinga,et al.  Principles of Loads and Failure Mechanisms: Applications in Maintenance, Reliability and Design , 2013 .

[14]  Liliane Pintelon,et al.  Quantifying the Benefit of Prognostic Information in Maintenance Decision Making , 2011 .

[15]  Mohan Anantharaman Using Reliability Block Diagrams and Fault Tree circuits, to develop a Condition Based Maintenance Model for a Vessel’s Main Propulsion System and Related Subsystems , 2013 .

[16]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[17]  Richard Curran,et al.  An Ontology-Based Approach for Aircraft Maintenance Task Support , 2013, ISPE CE.