BOT Viability Model for Large-Scale Infrastructure Projects
暂无分享,去创建一个
[1] Liyin Shen,et al. APPLICATION OF BOT SYSTEM FOR INFRASTRUCTURE PROJECTS IN CHINA , 1996 .
[2] Irem Dikmen Ozdoganm,et al. A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects , 2000 .
[3] Robert L. K. Tiong,et al. Competitive advantage of equity in BOT tender , 1995 .
[4] Robert L. K. Tiong. Comparative Study of BOT Projects , 1990 .
[5] Photios G. Ioannou,et al. Company and Project Evaluation Model for Privately Promoted Infrastructure Projects , 1996 .
[6] Tin-sang. Li,et al. Build-operate-transfer (BOT) projects for infrastructure development , 1996 .
[7] Ahmed Fouad Mostafa Salman. Study of applying build operate and transfer bot contractual system on infrastructure projects in Egypt , 2003 .
[8] Malik Ranasinghe,et al. Private sector participation in infrastructure projects: a methodology to analyse viability of BOT , 1999 .
[9] T. Saaty,et al. Procedures for Synthesizing Ratio Judgements , 1983 .
[10] Robert L. K. Tiong,et al. Impact of Financial Package versus Technical Solution in a BOT Tender , 1995 .
[11] R. Tiong,et al. Critical Success Factors in Winning BOT Contracts , 1992 .
[12] R. Tiong. CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1996 .
[13] S. V. Narasimham,et al. Discussion: CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1998 .
[14] S. Levy. Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure , 2008 .