Decision support system in management of concrete demolition waste

Abstract Processes of concrete waste management can be carried out using various technological and organizational systems. Such systems must meet the boundary conditions of a given project involving deconstruction of a building and will differ in terms of waste management costs, environmental impact and nuisance to the surrounding community. Selecting the most advantageous solution, taking into account numerous standards such as sustainable development, requires a multiple-criteria analysis of such variants. The system presented in this work supports the decision-making process in terms of choosing a technological and organizational solution in the field of concrete waste management. It is based on a mathematical simulation model, which produces rating indicators for technological-organizational waste management systems. Based on a synthetic rating indicator, the decision maker is provided with a list of ranked variants to choose from. Moreover, the system analyses qualitative parameters, such as the building site area required and waste management time.

[1]  Jose-Luis Galvez-Martos,et al.  Construction and demolition waste management , 2020 .

[2]  Chi Ming Tam,et al.  Non-structural fuzzy decision support system for evaluation of construction safety management system , 2002 .

[3]  Sung Kin Pun,et al.  Salvage material logistics management for building demolition project , 2005 .

[4]  M. Matsuoka,et al.  Involvement of lysosomal dysfunction in silver nanoparticle-induced cellular damage in A549 human lung alveolar epithelial cells , 2016, Journal of Occupational Medicine and Toxicology.

[5]  Vivian W. Y. Tam,et al.  Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review , 2020 .

[6]  Agnieszka Dziadosz,et al.  Review of Selected Methods of Supporting Decision-Making Process in the Construction Industry , 2016 .

[7]  Frank Schultmann,et al.  Energy-oriented deconstruction and recovery planning , 2007 .

[8]  Izabela Skrzypczak Zmodyfikowany rozmyty system ekspertowy wspomagający wnioskowanie o jakości betonu , 2012 .

[9]  Saurabh Gupta,et al.  An overview of sustainability assessment methodologies , 2009 .

[10]  Jaafar Alghazo,et al.  A Case Study of Sustainable Construction Waste Management in Saudi Arabia , 2018 .

[11]  H. Gulvanessian,et al.  EN1991 Eurocode 1: Actions on structures , 2001 .

[12]  Cliff Schexnayder,et al.  Probability Distribution Functions for Construction Simulation , 2000 .

[13]  Joseph Sarkis,et al.  Barriers to the Implementation of Environmentally Oriented Reverse Logistics: Evidence from the Automotive Industry Sector , 2010 .

[14]  Jorge de Brito,et al.  Handbook of Recycled Concrete and Demolition Waste , 2013 .

[15]  B. Rouhi Broujeni,et al.  Construction and Demolition Waste Management (Tehran Case Study) , 2016 .

[16]  Weisheng Lu,et al.  Stakeholders’ willingness to pay for enhanced construction waste management: A Hong Kong study , 2015 .

[17]  Un Desa Transforming our world : The 2030 Agenda for Sustainable Development , 2016 .

[18]  Mohammad Mojtahedi,et al.  A conceptual foundation for effective construction and demolition waste management , 2020 .

[19]  J. Pereira,et al.  Construction waste management in a developing country: Case study of Ipoh, Malaysia , 2008 .

[20]  J. de Brito,et al.  Conventional demolition versus deconstruction techniques in managing construction and demolition waste (CDW) , 2013 .

[21]  Kuldip Singh Sangwan,et al.  Development of an interpretive structural model of drivers for reverse logistics implementation in Indian industry , 2013 .

[22]  Nezir Aydin Designing reverse logistics network of end-of-life-buildings as preparedness to disasters under uncertainty , 2020 .

[23]  Anna Sobotka,et al.  Cost-saving Environmental Activities on Construction Site – Cost Efficiency of Waste Management: Case Study☆ , 2016 .

[24]  Yoshikuni Yoshida,et al.  An Advanced Concrete Recycling Technology and its Applicability Assessment through Input-Output Analysis , 2005 .

[25]  Paola Sassi,et al.  Designing buildings to close the material resource loop , 2004 .

[26]  Paul R. Harper,et al.  Locational analysis: highlights of growth to maturity , 2009, J. Oper. Res. Soc..

[27]  Zahir Irani,et al.  Intelligent Systems Research in the Construction Industry , 2014, Expert Syst. Appl..

[28]  Sou-Sen Leu,et al.  RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .

[29]  F. Schultmann,et al.  Organisation of reverse logistics tasks in the construction industry , 2007 .

[30]  Ruth Hillary Environmental management systems and the smaller enterprise , 2004 .

[31]  Michael Morgan,et al.  Silica dust exposures during selected construction activities. , 2003, AIHA journal : a journal for the science of occupational and environmental health and safety.

[32]  Ar. Meena.,et al.  Study on Time Delay Analysis for Construction Project Delay Analysis , 2015 .

[33]  Trpimir Kujundžić,et al.  FUEL CONSUMPTION AND ENGINE LOAD FACTORS OF EQUIPMENT IN QUARRYING OF CRUSHED STONE , 2016 .

[34]  Abdulmaten Taroun,et al.  Decision Support System (DSS) for Construction Project Risk Analysis and Evaluation via Evidential Reasoning (ER) , 2012 .

[35]  C. Brauer,et al.  Total and respirable dust exposures among carpenters and demolition workers during indoor work in Denmark , 2016, Journal of Occupational Medicine and Toxicology.

[36]  R. Shankar,et al.  ANALYSIS OF INTERACTIONS AMONG THE BARRIERS OF REVERSE LOGISTICS , 2005 .

[37]  Kuldip Singh Sangwan,et al.  Development of an interpretive structural model of drivers for reverse logistics implementation in Indian industry , 2013, Int. J. Bus. Perform. Supply Chain Model..

[38]  Rana Pant,et al.  A distance-to-target weighting method for Europe 2020 , 2016, The International Journal of Life Cycle Assessment.

[39]  Megan Beardsley,et al.  Median Life, Annual Activity, and Load Factor Values for Nonroad Engine Emissions Modeling , 1998 .

[40]  R Lahdelma,et al.  Using Multicriteria Methods in Environmental Planning and Management , 2000, Environmental management.

[41]  Yingbin Feng,et al.  Designing recycling networks for construction and demolition waste based on reserve logistics research field , 2020 .

[42]  Oleg Kapliński,et al.  Development and usefulness of planning techniques and decision‐making foundations on the example of construction enterprises in Poland , 2008 .

[43]  Bill Addis,et al.  Building with Reclaimed Components and Materials: A Design Handbook for Reuse and Recycling , 2006 .

[44]  Jerzy Pasławski,et al.  Flexible Approach for Construction Process Management Under Risk and Uncertainty , 2017 .

[45]  Charles J. Kibert,et al.  Construction ecology and metabolism: natural system analogues for a sustainable built environment , 2000 .

[46]  G. O. Oliveira Neto,et al.  Environmental and economic advantages of adopting reverse logistics for recycling construction and demolition waste: A case study of Brazilian construction and recycling companies , 2019, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[47]  Andrzej Minasowicz,et al.  Analiza wielokryterialnego wyboru najkorzystniejszej oferty w postępowaniach przetargowych z wykorzystaniem systemu eksperckiego opartego na przesłankach rozmytych , 2010 .

[48]  Abdul Razak Hamdan,et al.  Decision Support Systems (DSS) in Construction Tendering Processes , 2010, ArXiv.