Operational experience with a near-integer working point at RHIC
暂无分享,去创建一个
N. Malitsky | S. Tepikian | C. Montag | T. Roser | M. Bai | J. Beebe-Wang | T. Satogata | Y. Luo | FischW
[1] C. Montag,et al. Simple Beam-Optic Simulations and Proposed Mechanical Mitigation for the Triplet Oscillation Problem , 2008 .
[2] R. Calaga,et al. A near-integer working point for polarized protons in the relativistic heavy ion collider , 2007, 2007 IEEE Particle Accelerator Conference (PAC).
[3] C. Montag,et al. Damping vs. Clamping to Mitigate the RHIC Triplet Oscillations , 2007 .
[4] A. Sidi-Yekhlef,et al. Observation of helium flow induced beam orbit oscillations at RHIC , 2006 .
[5] F. Pilat,et al. Rhic Polarized Proton New Working Point Commissioning , 2005 .
[6] W. Fischer,et al. QUEST FOR A NEW WORKING POINT IN RHIC. , 2004 .
[7] F. Pilat,et al. Observation of strong-strong and other beam-beam effects in RHIC , 2003, Proceedings of the 2003 Particle Accelerator Conference.