An Integrated Optimization Model for Inventory and Quality Control Problems

In this paper, we develop an integrated economic model for inventory and quality control problems, extending the work of Rahim ( IIE Transactions 1994; 26(6): 2–11) and Rahim and Ben-Daya (IJPR 1998; 36(1): 277–289). The production process is subject to an assignable cause which shifts the process from an in-control state to an out-of-control state. We consider the shifts in both the process mean and the process variance. When a signal for an assignable cause is triggered, a search is initiated and is terminated upon finding the cause within a pre-specified target time. The process is then brought back to an in-control state by repair. However, if the assignable cause is not discovered within the pre-specified time, production is allowed to continue until the next sampling or warning, whichever occurs first. In this case, either the alarm is considered to be false with a probability of Type I error, or the assignable cause has not been eliminated with a probability of Type II error. In the latter case, the process produces products in an out-of-control state until the next sampling or warning, whichever occurs first. However, this state does not indicate any severe damage to the system. Joint X and R charts are used for monitoring both process mean and variance. Under these conditions, a generalized economic model for the joint determination of production quantity, an inspection schedule, and the design of the X and R control charts are developed. A direct search optimization method is used to determine the optimal decision variables of the economic model.

[1]  Douglas C. Montgomery,et al.  Introduction to Statistical Quality Control , 1986 .

[2]  Erwin M. Saniga,et al.  Economic Statistical Control-Chart Designs With an Application to and R Charts , 1989 .

[3]  Lonnie C. Vance Bibliography of Statistical Quality Control Chart Techniques, 1970-1980 , 1983 .

[4]  George Tagaras A Survey of Recent Developments in the Design of Adaptive Control Charts , 1998 .

[5]  Douglas C. Montgomery,et al.  The Economic Design of Control Charts: A Review and Literature Survey , 1980 .

[6]  M. A. Rahim,et al.  AN INTEGRATED ECONOMIC DESIGN MODEL FOR QUALITY CONTROL, REPLACEMENT, AND MAINTENANCE , 2001 .

[7]  P. K. Banerjee,et al.  Optimal production run for a process with random linear drift , 1988 .

[8]  M. A. Rahim JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN , 1994 .

[9]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[10]  W. K. Chiu,et al.  Economic Design of Attribute Control Charts , 1975 .

[11]  Antonio Fernando Branco Costa,et al.  JOINT ECONOMIC DESIGN OF X¯ AND R CONTROL CHARTS FOR PROCESSES SUBJECT TO TWO INDEPENDENT ASSIGNABLE CAUSES , 1993 .

[12]  P. K. Banerjee,et al.  THE ECONOMIC DESIGN OF CONTROL CHARTS: A RENEWAL THEORY APPROACH , 1987 .

[13]  Abdur Rahim,et al.  An economic model for \font\twelveit=cmti10 scaled 1600$\overline{\kern‐0.85ex\hbox{\twelveit X}}$\nopagenumbers\end and R charts with time‐varying parameters , 2002 .

[14]  Antonio Fernando Branco Costa,et al.  Joint X̄ and R charts with variable parameters , 1998 .

[15]  Smiley W. Cheng,et al.  Monitoring Process Mean and Variability with One EWMA Chart , 2001 .

[16]  Antonio Fernando Branco Costa,et al.  Joint economic design of x and R charts under Weibull shock models , 2000 .

[17]  Kenneth E. Case,et al.  Economic Design of Control Charts: A Literature Review for 1981–1991 , 1994 .

[18]  M. A. Rahim Determination of Optimal Design Parameters of Joint X̄ and R Charts , 1989 .

[19]  Robert Hooke,et al.  `` Direct Search'' Solution of Numerical and Statistical Problems , 1961, JACM.

[20]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[21]  M. A. Rahim,et al.  Economic design of x -control charts under Weibull shock models , 1988 .

[22]  Kenneth E. Case,et al.  Economic Design of a Joint X- and R -Control Chart , 1981 .

[23]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[24]  Acheson J. Duncan,et al.  The Economic Design of X Charts Used to Maintain Current Control of a Process , 1956 .

[25]  Mohamed Ben-Daya,et al.  A generalized economic model for joint determination of production run, inspection schedule and control chart design , 1998 .