A Framework to Implement Supply and Demand Side Contingency Management in Reliability Assessment of Restructured Power Systems
暂无分享,去创建一个
Peng Wang | L. Goel | L. Goel | Peng Wang | V. P. Aparna | V.P. Aparna
[1] E. Allen,et al. Reserve markets for power systems reliability , 2000 .
[2] R. Billinton,et al. Reliability assessment of a restructured power system considering the reserve agreements , 2004, IEEE Transactions on Power Systems.
[3] Probability Subcommittee,et al. IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.
[4] Wenyuan Li,et al. Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .
[5] F. Alvarado,et al. Designing incentive compatible contracts for effective demand management , 2000 .
[6] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[7] F. Galiana,et al. Demand-side reserve offers in joint energy/reserve electricity markets , 2003 .
[8] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .
[9] Roy Billinton,et al. A minimum cost assessment method for composite generation and transmission system expansion planning , 1993 .
[10] R. Billinton,et al. A Canadian customer survey to assess power system reliability worth , 1994 .
[11] Fernando L. Alvarado,et al. Using utility information to calibrate customer demand management behavior models , 2002, 2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309).
[12] K. Bhattacharya,et al. Competitive framework for procurement of interruptible load services , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).