Connection part construction method of concrete pavement road and asphalt pavement road and the connection material

PURPOSE: A pre-construction of the connection part between a concrete paved road and the shoulder of asphalt road is provided to prevent damage to a connection member by dispersing the load applied to the connection member using a fiber reinforcing member buried in a rubberized asphalt molding joint. CONSTITUTION: A pre-construction of the connection part between a concrete paved road and the shoulder of asphalt road is as follows. A road is paved with concrete. Aggregate(4) is installed between a concrete paved road(2) and a paved dyke(3). A connection element(10) having the elasticity in a longitudinal direction is attached to the upper side part of the concrete paved road. Asphalt is poured on the top of the installed aggregate, when the connection element is attached to the concrete paved road.