Redesign of PCB production line with simulation and Taguchi design
暂无分享,去创建一个
[1] Ulrich Dieter,et al. Discrete Optimization Approximating k-cuts using network strength as a Lagrangean relaxation , 2000 .
[2] L. T. Wille,et al. Comparative study of heuristics for optimal printed circuit board assembly , 1995, Proceedings of Southcon '95.
[3] T. R. Bement,et al. Taguchi techniques for quality engineering , 1995 .
[4] Farhad Azadivar,et al. A tutorial on simulation optimization , 1992, WSC '92.
[5] Robert J. Graves,et al. An examination of routeing flexibility for small batch assembly of printed circuit boards , 1990 .
[6] L. P. Khoo,et al. PCB assembly planning using genetic algorithms , 1998 .
[7] Robert H. Lochner,et al. Designing for Quality , 1990 .
[8] Yeong-Dae Kim,et al. Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process , 1996 .
[9] Hsiang-Kuan Kung,et al. A just-in-time simulation model of a PCB assembly line , 1991 .
[10] N. Mort,et al. Simulation and optimisation in manufacturing systems using Taguchi methods , 1996 .
[11] J Disney,et al. Designing for quality , 2001 .
[12] Chi-Sheng Tsai,et al. Evaluation and optimisation of integrated manufacturing system operations using Taguch's experiment design in computer simulation , 2002 .
[13] D. Stamatis,et al. Orthogonal Arrays and Linear Graphs , 2002 .
[14] K. Rajkumar,et al. A bi-criteria model for loading on PCB assembly machines , 1997 .
[15] Madhan Shridhar Phadke,et al. Quality Engineering Using Robust Design , 1989 .
[16] Berna Dengiz,et al. Computer simulation of a PCB production line: metamodeling approach , 2000 .
[17] K. Rajkumar,et al. A heuristic for sequencing PCB assembly to minimize set-up times , 1998 .
[18] Oded Maimon,et al. A genetic algorithm approach to scheduling PCBs on a single machine , 1998 .