Design of Robust Supply Chains: An Integrated Hierarchical Planning Approach

In a supply chain operating under uncertainty, a possible approach to reduce the complexity and scope of the planning process is to organize all involved critical planning decisions in a hierarchical structure. This chapter attempts to explore new ways of integrating production and scheduling plans in a complex supply chain taking into account effects of some specific uncertainty types. In particular, uncertainty types inherent to the demand and to the process or equipment are considered. To deal with demand uncertainty at the strategic level, the safety stock placement problem in supply chains with limited production capacities is investigated. Results of this analysis and its consequences at the design level are reported and discussed. At the tactical level, each stage in the supply chain generates its own aggregate plans in order to balance supply and demand. To deal with uncertainty at this level, some robust deterministic planning models are discussed. These models make use only of the readily available data, such as averages and standard deviations, related to the uncertain planning parameters. At the operational level, the issue of disaggregating the generated robust tactical plans into detailed plans is investigated. A model taking into account the progressive deterioration of the production equipment is discussed. The results of some simulations are also reported and discussed.

[1]  B. RAA,et al.  A robust dynamic planning strategy for lot-sizing problems with stochastic demands , 2005, J. Intell. Manuf..

[2]  Juite Wang,et al.  A possibilistic decision model for new product supply chain design , 2007, Eur. J. Oper. Res..

[3]  Dennis Kira,et al.  A stochastic linear programming approach to hierarchical production planning , 1997 .

[4]  Cheng-Liang Chen,et al.  MULTI-CRITERIA FUZZY OPTIMIZATION FOR LOCATING WAREHOUSES AND DISTRIBUTION CENTERS IN A SUPPLY CHAIN NETWORK , 2007 .

[5]  M. Laguna,et al.  Applying Robust Optimization to Capacity Expansion of One Location in Telecommunications with Demand Uncertainty , 1998 .

[6]  S. Minner,et al.  Manufacturing network configuration in supply chains with product recovery , 2009 .

[7]  A. Lusa,et al.  A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty , 2008 .

[8]  Hendrik Van Landeghem,et al.  Safety stock placement problem in capacitated supply chains , 2008 .

[9]  Dean A. Jones,et al.  Robust optimization for fleet planning under uncertainty , 2003 .

[10]  El Houssaine Aghezzaf,et al.  Robust Production Planning: An Alternative to Scenario-Based Optimization Models , 2008, MCO.

[11]  Costas D. Maranas,et al.  Managing demand uncertainty in supply chain planning , 2003, Comput. Chem. Eng..

[12]  Han-Lin Li,et al.  A robust optimization model for stochastic logistic problems , 2000 .

[13]  Michal Kaut,et al.  Evaluation of scenario-generation methods for stochastic programming , 2007 .

[14]  Denis Royston Towill,et al.  UNCERTAINTY AND THE SEAMLESS SUPPLY CHAIN , 2002 .

[15]  Yongpei Guan,et al.  A branch-and-cut algorithm for the stochastic uncapacitated lot-sizing problem , 2006, Math. Program..

[16]  David L. Olson,et al.  Supply chain risk, simulation, and vendor selection , 2008 .

[17]  John Mapes The Effect of Capacity Limitations on Safety Stock , 1993 .

[18]  Arkadi Nemirovski,et al.  Robust Convex Optimization , 1998, Math. Oper. Res..

[19]  Scott A. Malcolm,et al.  Robust Optimization for Power Systems Capacity Expansion under Uncertainty , 1994 .

[20]  El Houssaine Aghezzaf,et al.  An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..

[21]  Robert J. Vanderbei,et al.  Robust Optimization of Large-Scale Systems , 1995, Oper. Res..

[22]  Yugeng Xi,et al.  Robust and stable scheduling of a single machine with random machine breakdowns , 2006 .

[23]  H. V. Landeghem,et al.  Robust planning: a new paradigm for demand chain planning , 2002 .

[24]  Chen-Hua Chung,et al.  Integrating maintenance and production decisions in a hierarchical production planning environment , 1999, Comput. Oper. Res..

[25]  Stephen C. H. Leung *,et al.  A robust optimization model for stochastic aggregate production planning , 2004 .

[26]  A. Westerberg,et al.  Multi-objective Decisions on Capacity Planning and Production−Inventory Control under Uncertainty , 2004 .

[27]  Marianthi G. Ierapetritou,et al.  Process scheduling under uncertainty: Review and challenges , 2008, Comput. Chem. Eng..

[28]  Alexandre Dolgui,et al.  Supply planning under uncertainties in MRP environments: A state of the art , 2007, Annu. Rev. Control..

[29]  Chunfu Jia Stochastic single machine scheduling with an exponentially distributed due date , 2001, Oper. Res. Lett..

[30]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[31]  Yu Xia,et al.  Job sequencing and due date assignment in a single machine shop with uncertain processing times , 2008, Eur. J. Oper. Res..

[32]  Jeffery K. Cochran,et al.  Carrier-mode logistics optimization of inbound supply chains for electronics manufacturing , 2006 .

[33]  Joaquín Sicilia,et al.  A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures , 2005 .

[34]  Hau L. Lee,et al.  A ROBUSTNESS APPROACH TO FACILITIES DESIGN , 1987 .

[35]  Sean P. Willems,et al.  Optimizing Strategic Safety Stock Placement in Supply Chains , 2000, Manuf. Serv. Oper. Manag..

[36]  El Houssaine Aghezzaf,et al.  Models for robust tactical planning in multi-stage production systems with uncertain demands , 2010, Comput. Oper. Res..

[37]  Josef Kallrath,et al.  Solving Planning and Design Problems in the Process Industry Using Mixed Integer and Global Optimization , 2005, Ann. Oper. Res..

[38]  Willy Herroelen,et al.  The complexity of machine scheduling for stability with a single disrupted job , 2005, Oper. Res. Lett..

[39]  Athanasios V. Vasilakos,et al.  Interactive theatre via mixed reality and Ambient Intelligence , 2008, Inf. Sci..

[40]  Gabriel R. Bitran,et al.  Chapter 10 Hierarchical production planning , 1993, Logistics of Production and Inventory.

[41]  El Houssaine Aghezzaf,et al.  Integrated production planning and preventive maintenance in deteriorating production systems , 2008, Inf. Sci..

[42]  Jie Chen,et al.  Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns , 2003 .

[43]  Emek Barış Kepenek Socio-Technical Issues in Youth Employment in SMEs: The Case of the Furniture Sector in Turkey , 2013 .

[44]  Sanjay Mehta,et al.  Predictable scheduling of a single machine subject to breakdowns , 1999, Int. J. Comput. Integr. Manuf..

[45]  M. Goetschalckx,et al.  MODELING THE EFFECT OF UNCERTAINTIES ON GLOBAL LOGISTICS SYSTEMS. , 2000 .

[46]  Matthew J. Roorda,et al.  A tour-based model of travel mode choice , 2005 .

[47]  B. J. Lageweg,et al.  Analysis of Heuristics for Stochastic Programming: Results for Hierarchical Scheduling Problems , 1983, Math. Oper. Res..

[48]  H. Van Landeghem,et al.  Cyclical volume planning and fair share mix decisions, delivering a more robust service level , 2008 .

[49]  Atsuo Takanishi,et al.  Human-friendly robots for entertainment and education , 2012 .

[50]  E. Aghezzaf,et al.  Capacity planning and warehouse location in supply chains with uncertain demands , 2005, J. Oper. Res. Soc..

[51]  Gabriel R. Bitran,et al.  Hierarchical Production Planning: A Single Stage System , 1981, Oper. Res..

[52]  K. Srinivasan,et al.  Longer-term changes in mode choice decisions in Chennai: a comparison between cross-sectional and dynamic models , 2007 .

[53]  W. J. Chen,et al.  Scheduling under machine breakdown in a continuous process industry , 2004, Comput. Oper. Res..