Meta-Models for Integrating Production Management Functions in Heterogeneous Industrial Systems

Several heterogenous processes can be found in industrial practice, such as plants involving partly continuous, partly discrete manufacturing and companies composed by departments managed by different production planning philosophies. An efficient management of heterogeneity calls for decentralization. This paper addresses a distributed approach to job-shop scheduling in discrete manufacturing, by analysing conditions for a robust integration of a set of autonomous multiple agents for the shop-floor control in a time-varying manufacturing environment. Instead of machines processing jobs according to a plan established by a global controller, a population of intelligent local controllers should cooperatively operate in order to achieve both individual goals (the best possible utilization of machining and transportation resources) and the overall system target (minimum waiting time).

[1]  Shimon Y. Nof,et al.  DECISION INTEGRATION FUNDAMENTALS IN DISTRIBUTED MANUFACTURING TOPOLOGIES , 1992 .

[2]  James J. Solberg,et al.  INTEGRATED SHOP FLOOR CONTROL USING AUTONOMOUS AGENTS , 1992 .

[3]  Albert D. Baker Complete manufacturing control using a contract net: a simulation study , 1988, [Proceedings] 1988 International Conference on Computer Integrated Manufacturing.

[4]  B. Descotes-Genon,et al.  Petri net based node structures for distributed problem solving in FMS control , 1992 .

[5]  Alan H. Bond,et al.  Distributed Artificial Intelligence , 1988 .

[6]  Michel Roboam Intelligent networking architecture: AI in integrating the enterprise , 1991 .

[7]  Michael Jeng-Ping Shaw,et al.  A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems , 1987 .

[8]  J. R. Perkins,et al.  Stable, distributed, real-time scheduling of flexible manufacturing/assembly/diassembly systems , 1989 .

[9]  Agostino Villa,et al.  Production management: Beyond the dichotomy between push' and pull' , 1993 .

[10]  Keith S. Decker,et al.  Distributed problem-solving techniques: A survey , 1987, IEEE Transactions on Systems, Man, and Cybernetics.

[11]  Moshe Krieger,et al.  Object-oriented approach to the specification of manufacturing systems , 1992 .

[12]  Agostino Villa,et al.  Methodological approach to planning and justifying technological innovation in manufacturing , 1991 .

[13]  Egon Balas,et al.  The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .

[14]  Walter Ukovich,et al.  Factory Level Aggregate Scheduling: A Basis For A Hierarchical Approach , 1992, Proceedings of the Third International Conference on Computer Integrated Manufacturing,.

[15]  K. Ueda An Approach to Bionic Manufacturing Systems Based on DNC-Type information , 1992 .

[16]  Agostino Villa Hybrid control systems in manufacturing , 1991 .

[17]  Hanan Luss,et al.  A due date assignment algorithm for multiproduct manufacturing facilities , 1993 .

[18]  H. V. Parunak Chapter 10 – Manufacturing Experience with the Contract Net , 1987 .