A Computer Simulation Based Scheduler for Woven Fabric Production
暂无分享,去创建一个
Finding a feasible schedule for assigning hundreds of different fabric orders on hundreds of looms to meet the order due dates and to maximize loom utilization is a diverse and complicated task. Such a scheduling problem is of significance in practice. An attempt is made to develop a computer simulation based scheduling system to cope with this problem. An application trial of this approach by a real weaving mill is also reported.
[1] A. Guinet. Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria , 1993 .
[2] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[3] W. A. Horn. Some simple scheduling algorithms , 1974 .
[4] A. Guinet,et al. Textile Production Systems: a Succession of Non-identical Parallel Processor Shops , 1991 .