A Computer Simulation Based Scheduler for Woven Fabric Production

Finding a feasible schedule for assigning hundreds of different fabric orders on hundreds of looms to meet the order due dates and to maximize loom utilization is a diverse and complicated task. Such a scheduling problem is of significance in practice. An attempt is made to develop a computer simulation based scheduling system to cope with this problem. An application trial of this approach by a real weaving mill is also reported.