A learning reactive scheduler using CBR/L
暂无分享,去创建一个
[1] Janet L. Kolodner,et al. Case-Based Reasoning , 1989, IJCAI 1989.
[2] J. Ross Quinlan,et al. C4.5: Programs for Machine Learning , 1992 .
[3] D. Yan,et al. An intelligent reactive monitoring and scheduling system , 1992, IEEE Control Systems.
[4] Elizabeth Szelke,et al. Knowledge-based reactive scheduling , 1994 .
[5] Christopher K. Riesbeck,et al. Inside Case-Based Reasoning , 1989 .
[6] Albert Jones,et al. Generic architecture for intelligent control systems , 1992 .
[7] Elizabeth Szelke,et al. Reactive Scheduling - An Intelligent Supervisor Function , 1993, Knowledge-Based Reactive Scheduling.
[8] László Monostori,et al. Reactive and proactive scheduling with learning in reactive operation management , 1995 .
[9] Jaime G. Carbonell,et al. An Overview of Machine Learning , 1983 .
[10] Donald Michie,et al. Expert systems in the micro-electronic age , 1979 .
[11] Edward P. K. Tsang,et al. Foundations of constraint satisfaction , 1993, Computation in cognitive science.
[12] Gavriel Salvendy,et al. Handbook of human factors. , 1987 .
[13] László Monostori,et al. Artificial neural networks in intelligent manufacturing , 1992 .
[14] E. Szelke,et al. A blackboard based perspective of reactive scheduling , 1995 .
[15] Robert M. Haralick,et al. Increasing Tree Search Efficiency for Constraint Satisfaction Problems , 1979, Artif. Intell..
[16] Khosrow Hadavi,et al. An Architecture for Real-Time Distributed Scheduling , 1992, AI Mag..
[17] Kazuo Miyashita,et al. Adaptive Schedule Repair , 1993, Knowledge-Based Reactive Scheduling.
[18] Stephen F. Smith,et al. Configurable Systems for Reactive Production Management , 1993, Knowledge-Based Reactive Scheduling.
[19] Norman M. Sadeh,et al. Constrained Heuristic Search , 1989, IJCAI.
[20] Andrew Kusiak. Knowledge-Based Systems in Manufacturing , 1989 .
[21] Steven Minton,et al. Minimizing Conflicts: A Heuristic Repair Method for Constraint Satisfaction and Scheduling Problems , 1992, Artif. Intell..
[22] Ivan Bratko,et al. Machine learning in artificial intelligence , 1993, Artif. Intell. Eng..
[23] Bernard Grabot,et al. Multi-heuristic scheduling: three approaches to tune compromises , 1994, J. Intell. Manuf..
[24] John R. Anderson,et al. MACHINE LEARNING An Artificial Intelligence Approach , 2009 .
[25] Rok Sosic,et al. Efficient Local Search with Conflict Minimization: A Case Study of the n-Queens Problem , 1994, IEEE Trans. Knowl. Data Eng..
[26] Fred Glover,et al. Integrating target analysis and tabu search for improved scheduling systems , 1993 .
[27] Rina Dechter,et al. Network-Based Heuristics for Constraint-Satisfaction Problems , 1987, Artif. Intell..
[28] Satish K. Tripathi,et al. Reactive scheduling for a single machine: problem definition, analysis, and heuristic solution , 1990 .
[29] Eugene C. Freuder. A Sufficient Condition for Backtrack-Free Search , 1982, JACM.
[30] A. Crespo,et al. REAKT: real-time architecture for time-critical knowledge-based systems , 1994 .