Deux Chemicals Inc. Goes Just-in-Time
暂无分享,去创建一个
[1] Michael H. Rothkopf,et al. Reliability and Inventory in a Production-Storage System , 1979 .
[2] M. Parlar,et al. Future supply uncertainty in EOQ models , 1991 .
[3] Esmail Mohebbi,et al. Supply interruptions in a lost-sales inventory system with random lead time , 2003, Comput. Oper. Res..
[4] N. E. Abboud. A discrete-time Markov production-inventory model with machine breakdowns , 2001 .
[5] Mahmut Parlar,et al. An Inventory Problem with Two Randomly Available Suppliers , 1997, Oper. Res..
[6] Ali Akgunduz,et al. A comparative study of heuristic algorithms on Economic Lot Scheduling Problem , 2008, Comput. Ind. Eng..
[7] T. Morton,et al. A periodic review, production planning model with uncertain capacity and uncertain demand—optimality of extended myopic policies , 1994 .
[8] Ramesh Bollapragada,et al. Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines , 1999 .
[9] Kamran Moinzadeh,et al. Analysis of a production/inventory system subject to random disruptions , 1997 .
[10] Ram Akella,et al. Optimal control of production rate in a failure prone manufacturing system , 1985 .
[11] Anis Gharbi,et al. Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale , 2007, Eur. J. Oper. Res..
[12] M. Parlar,et al. A periodic review inventory model with Markovian supply availability , 1995 .
[13] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[14] P. R. Parthasarathy,et al. On the unutilized capacity of a production-storage system , 1987 .
[15] Ioannis Ch. Paschalidis,et al. Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems , 2001, Oper. Res..
[16] A. Sharifnia,et al. Production control of a manufacturing system with multiple machine states , 1988 .
[17] Christos Koulamas. Single‐Stage and Serial Production Line Systems with Unreliable Machines and General Probability Distributions , 1993 .
[18] Lawrence V. Snyder,et al. Infinite-Horizon Models for Inventory Control under Yield Uncertainty and Disruptions , 2010 .
[19] Ali Gharbi,et al. Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems , 2003 .
[20] Morton J. M. Posner,et al. Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..
[21] Yigal Gerchak,et al. Coordination in decentralized assembly systems with uncertain component yields , 2007, Eur. J. Oper. Res..
[22] Rayadurgam Srikant,et al. Scheduling multiple part-types in an unreliable single machine manufacturing system , 1995, Proceedings of 1995 American Control Conference - ACC'95.
[23] Panganamala Ramana Kumar,et al. Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..
[24] Wallace J. Hopp,et al. Optimal inventory control in a production flow system with failures , 1989 .
[25] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[26] M. J. M. Posner,et al. Analysis of a production-inventory system with unreliable production facility , 1989 .
[27] D. Mitra. Stochastic theory of a fluid model of producers and consumers coupled by a buffer , 1988, Advances in Applied Probability.
[28] Ali Gharbi,et al. Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems , 2007 .