Analysis of Performance Measures of Computer Systems with Priority and Maximum Operation Time
暂无分享,去创建一个
[1] Ashish Kumar,et al. Probabilistic Analysis of Performance Measures of Redundant Systems Under Weibull Failure and Repair Laws , 2017 .
[2] S. C. Malik,et al. Profit Analysis of a Computer System With Priority to Software Replacement over Hardware Repair Subject to Maximum Operation and Repair Times , 2011 .
[3] M.A. Friedman,et al. Reliability techniques for combined hardware/software systems , 1992, Annual Reliability and Maintainability Symposium 1992 Proceedings.
[4] S. C. Malik,et al. Reliability Modelling of a Computer System with Independent H/W and S/W Failures Subject to Maximum Operation and Repair Times , 2012 .
[5] S. C. Malik,et al. Cost-Analysis Of A Computer System With Hardware Repair Subject To Inspection And Arbitrary Distributions For Hardware and Software Replacement , 2011 .
[6] Devesh Kumar Srivastava,et al. Profit Analysis of a Computing Machine with Priority and s/w Rejuvenation , 2018 .
[7] Yuan-Shun Dai,et al. A model for availability analysis of distributed software/hardware systems , 2002, Inf. Softw. Technol..
[8] Monika Saini,et al. Comparison of Various Reliability Measures of a Computer System with the Provision of Priority , 2016 .
[9] Barry W. Johnson,et al. Reliability modeling of hardware/software systems , 1995 .