Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process

This paper investigates the impact of quality improvement on the modified lot size reorder point models involving variable lead time and partial backorders. The formulated models include the imperfect production process and an investing option of improving the process quality. The objective is simultaneously optimizing the lot size, reorder point, process quality level and lead time. We first assume that the lead time demand follows a normal distribution, then relax this assumption to consider the distribution-free case where only the mean and standard deviation of lead time demand are known. An algorithm procedure of finding the optimal solution is developed, and two numerical examples are given to illustrate the results.

[1]  Mohamed Ben-Daya,et al.  Some stochastic inventory models with deterministic variable lead time , 1999, Eur. J. Oper. Res..

[2]  Ilkyeong Moon,et al.  A note on lead time and distributional assumptions in continuous review inventory models , 1998, Comput. Oper. Res..

[3]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[4]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[5]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[6]  Jack C. Hayya,et al.  Joint investment in quality improvement and setup reduction , 1995, Comput. Oper. Res..

[7]  G. Gallego,et al.  The Distribution Free Newsboy Problem: Review and Extensions , 1993 .

[8]  I. Moon Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions , 1994 .

[9]  I. Moon,et al.  The Distribution Free Newsboy Problem with Balking , 1995 .

[10]  G Keller,et al.  Impact of investing in quality improvement on the lot size model , 1988 .

[11]  D. Montgomery,et al.  INVENTORY MODELS WITH A MIXTURE OF BACKORDERS AND LOST SALES. , 1973 .

[12]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[13]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[14]  문일경 Multiproduct Economic Lot Size Models with Investment Costs for Setup Reduction and Quality Improvement , 1994 .

[15]  Hark Hwang,et al.  Multiproduct economic lot size models with investment costs for setup reduction and quality improvement , 1993 .

[16]  Ilkyeong Moon,et al.  Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies , 1997 .