Monitoring the deformation and strain analysis on the Ataturk Dam, Turkey

ABSTRACT Every man-made structure creates certain risks — dams are no exception. Most failures in man-made structures that have occurred could have been avoided if the structures’ behaviour had been inspected, monitored, and analyzed continuously, and if proper corrective measures had been taken in a timely fashion. The DSI (The General Directorate of State Hydraulic Works), which is the institution responsible for dam safety, has long used surveying methods to measure the displacements of geodetic points as a part of dam monitoring policy. In this study, we focus on the dam's mechanical behaviour throughout a time period of more than 10 years. These study results have been derived from a separate, ongoing project that has monitored deformation on the Ataturk Dam and is now determining the water level of the reservoir. The project results show that although the dam body has become more stable and the water load behind the dam has increased, the rate of displacement of the dam has declined significantly. From these results, it can be seen that the reservoir water level can be increased evenly over time and that 542 m is the maximum water level of the dam's reservoir.

[1]  William H. Prescott,et al.  An extension of Frank's method for obtaining crustal shear strains from survey data , 1976 .

[2]  Kurt Lambeck,et al.  Methods and geophysical applications of satellite geodesy , 1979 .

[3]  F. Brunner ON THE ANALYSIS OF GEODETIC NETWORKS FOR THE DETERMINATION OF THE INCREMENTAL STRAIN TENSOR , 1979 .

[4]  M. A. R. Cooper,et al.  Control Surveys In Civil Engineering , 1987 .

[5]  J. D. Zund,et al.  Geophysical Geodesy: The Slow Deformation of the Earth , 1991 .

[6]  J. Kakkuri,et al.  On horizontal crustal strain in Finland , 1992 .

[7]  Kenneth W. Hudnut,et al.  Monitoring Structural Deformation at Pacoima Dam, California Using Continuous GPS , 1998 .

[8]  S. Levitus,et al.  US Government Printing Office , 1998 .

[9]  Madhav N. Kulkarni,et al.  STUDY OF THE DEFORMATION OF KOYNA DAM USING THE GLOBAL POSITIONING SYSTEM , 2002 .

[10]  Stathis C. Stiros,et al.  Ladon dam (Greece) deformation and reservoir level fluctuations: evidence for a causative relationship from the spectral analysis of a geodetic monitoring record , 2005 .

[11]  A. Pesci,et al.  Strain rate analysis over the Central Apennines from GPS velocities: the development of a new free software , 2006 .

[12]  Marta Ponseti,et al.  The Three Gorges Dam Project in China : history and consequences , 2006 .

[13]  Antonio Galgaro,et al.  Grid_strain and grid_strain3: Software packages for strain field computation in 2D and 3D environments , 2008, Comput. Geosci..

[14]  Levent Taşçi,et al.  Dam deformation measurements with GPS , 2008 .

[15]  B. Riley,et al.  EMERGENCY MANAGEMENT AGENCY , 2009 .

[16]  Serif Hekimoglu,et al.  Increasing the Efficacy of the Conventional Deformation Analysis Methods: Alternative Strategy , 2010 .

[17]  Serdar Bilgi,et al.  Deformation Monitoring Studies at Atatürk Dam , 2010 .

[18]  Wei Li,et al.  GPS in the Tailings Dam Deformation Monitoring , 2011 .

[19]  Robert B. Jansen,et al.  Dams and Public Safety , 2011 .

[20]  Yunus Kalkan,et al.  Geodetic deformation monitoring of Ataturk Dam in Turkey , 2012, Arabian Journal of Geosciences.

[21]  Engin Gülal Structural deformations analysis by means of Kalman-filtering , 2013 .

[22]  Bo Chen,et al.  Failure analysis method of concrete arch dam based on elastic strain energy criterion , 2016 .

[23]  Cemal Ozer Yigit,et al.  Displacement response of a concrete arch dam to seasonal temperature fluctuations and reservoir level rise during the first filling period: evidence from geodetic data , 2016 .

[24]  R. Boulanger,et al.  Nonlinear deformation analyses of an embankment dam on a spatially variable liquefiable deposit , 2016 .

[25]  Hossein A. Taiebat,et al.  Application of advanced bounding surface plasticity model in static and seismic analyses of Zipingpu Dam , 2016 .

[26]  E. Bauer,et al.  Numerical stress-deformation analysis of cut-off wall in clay-core rockfill dam on thick overburden , 2016 .

[27]  Y. Kalkan,et al.  Assessment of Vertical Deformation of the Atatürk Dam Using Geodetic Observations , 2016 .