Overruns in transportation infrastructure projects
暂无分享,去创建一个
Peter E.D. Love | Zahir Irani | Xiangyu Wang | Chun-Pung Sing | Didibhuku W. Thwala | Z. Irani | Xiangyu Wang | P. Love | D. Thwala | Chun-Pung Sing
[1] Mette K. Skamris,et al. Accuracy of Traffic Forecasts and Cost Estimates on Large Transportation Projects , 1996 .
[2] Peter E.D. Love,et al. Quantifying the causes and costs of rework in construction , 2000 .
[3] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[4] W. B. Ledbetter,et al. Causes of Quality Deviations in Design and Construction , 1992 .
[5] Bent Flyvbjerg,et al. Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure , 2007, 1303.7402.
[6] Steve Rowlinson,et al. A Definition of Procurement Systems , 1998 .
[7] Forrest D. Clark,et al. Applied Cost Engineering , 1978 .
[8] Fazil T. Najafi,et al. Cost and time overruns in highway construction , 2002 .
[9] Samuel Labi,et al. Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach , 2008 .
[10] Bent Flyvbjerg,et al. Procedures for Dealing with Optimism Bias in Transport Planning , 2004 .
[11] Pamela L. Alreck,et al. The Survey Research Handbook , 1984 .
[12] Mette K. Skamris,et al. Inaccuracy of traffic forecasts and cost estimates on large transport projects , 1997 .
[13] Paolo Gardoni,et al. A Probabilistic Framework for Bayesian Adaptive Forecasting of Project Progress , 2007, Comput. Aided Civ. Infrastructure Eng..
[14] Bon-Gang Hwang,et al. Measuring the Impact of Rework on Construction Cost Performance , 2009 .
[15] David K. H. Chua,et al. Key determinants for construction schedule performance , 1999 .
[16] Søren L. Buhl,et al. Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.
[17] Andrew S. Chang. Reasons for cost and schedule increase for engineering design projects , 2002 .
[18] C. D. Sinclair,et al. An Analysis of the Distribution of Extreme Share Returns in the UK from 1975 to 2000 , 2004 .
[19] Peter E.D. Love,et al. Congruence or divergence? A path model of rework for building and civil engineering projects , 2009 .
[20] Indra Gunawan,et al. Analysis of cost and schedule performance of international development projects , 2010 .
[21] Charles T. Jahren,et al. Predictors of Cost‐Overrun Rates , 1990 .
[22] David Baccarini. Accuracy in estimating project cost construction contingency - a statistical analysis , 2004 .
[23] J. R. Michael. The stabilized probability plot , 1983 .
[24] David J. Edwards,et al. Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Project , 2009, IEEE Transactions on Engineering Management.
[25] Peter E.D. Love,et al. Determining the probability distribution of rework costs in construction and engineering projects , 2013 .
[26] Ren-Jye Dzeng,et al. Integration of Simulation-Based Cost Model and Multi-Criteria Evaluation Model for Bid Price Decisions , 2007, Comput. Aided Civ. Infrastructure Eng..
[27] Fabian C. Hadipriono,et al. Study of recent building failures in the United States , 2003 .
[28] Zahir Irani,et al. Causal Discovery and Inference of Project Disputes , 2011, IEEE Transactions on Engineering Management.
[29] Johnny Wong,et al. Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects , 2010 .
[30] Peter E.D. Love,et al. Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .
[31] David J. Edwards,et al. Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns , 2012, IEEE Transactions on Engineering Management.
[32] Jimmie Hinze,et al. COST OVERRUNS ON STATE OF WASHINGTON CONSTRUCTION CONTRACTS , 1992 .
[33] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[34] Peter E.D. Love,et al. Mapping rework causes and effects using artificial neural networks , 2008 .
[35] James Odeck,et al. Cost overruns in road construction--what are their sizes and determinants? , 2004 .
[36] C. Tomkins,et al. Quality failure costs in civil engineering projects , 2000 .
[37] Henry J Rowland. The Causes and Effects of Change Orders on the Construction Process. , 1981 .
[38] Peter E.D. Love,et al. Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects , 2009 .
[39] Samuel Labi,et al. Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts , 2010 .
[40] Takuji Nishimura,et al. Mersenne twister: a 623-dimensionally equidistributed uniform pseudo-random number generator , 1998, TOMC.
[41] Peter M. Chisnall,et al. Questionnaire Design, Interviewing and Attitude Measurement , 1993 .
[42] Bent Flyvbjerg,et al. Accuracy of Traffic Forecasts and Cost Estimates on Large Transportation Projects , 1996 .
[43] I. W. Burr. Cumulative Frequency Functions , 1942 .
[44] P.-E Josephson,et al. The causes and costs of defects in construction. A study of seven building projects , 1999 .