Developing a Quality Measure for Evaluating the Contractor Performance in Asphalt Pavement Construction
暂无分享,去创建一个
Ahmed H. Elyamany | Magdy Abdelrahman | Curt Doetkott | Fu-Chih Cheng | M. Abdelrahman | C. Doetkott | A. Elyamany | Fu-Chi Cheng
[1] Thomas L. Saaty,et al. Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .
[2] T. L. Saaty,et al. Decision making with dependence and feedback , 2001 .
[3] Douglas W. Hubbard,et al. How to Measure Anything: Finding the Value of "Intangibles" in Business , 2007 .
[4] John P. Zaniewski,et al. Evaluation of quality control parameters for Superpave hot mix asphalt , 2013 .
[5] John T Harvey,et al. Performance-based pay factors for asphalt concrete construction: comparison with a currently used experience-based approach , 2004 .
[6] Zhanmin Zhang,et al. Incorporating Variability into Pavement Performance, Life-Cycle Cost Analysis, and Performance-Based Specification Pay Factors , 2005 .
[7] Magdy Abdelrahman,et al. Evaluation of Superpave Construction Quality on Low Volume Roads (With Discussion) , 2008 .
[8] Søren L. Buhl,et al. Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.
[9] Philip Bromiley,et al. Strategic decision making , 2012 .
[10] Michael I Hammons,et al. Highway Construction Quality Index for Florida , 2008 .
[11] James L Burati,et al. OPTIMAL PROCEDURES FOR QUALITY ASSURANCE SPECIFICATIONS , 2003 .
[12] Thomas L. Saaty,et al. Decision Making for Leaders: The Analytical Hierarchy Process for Decisions in a Complex World , 1982 .
[13] N. Bhushan,et al. Strategic Decision Making: Applying the Analytic Hierarchy Process , 2004 .
[14] Richard M Weed. A Rational Method for Relating As-Built Quality to Pavement Performance and Value , 1998 .
[15] Richard M Weed. Method to Model Performance Relationships and Pay Schedules , 2000 .
[16] R J Cominsky,et al. Quality control and acceptance of Superpave-designed hot mix asphalt , 1998 .
[17] Amr Kandil,et al. Implementing Percent Within Limits for Hot Mix Asphalt , 2007 .