Developing a Quality Measure for Evaluating the Contractor Performance in Asphalt Pavement Construction

Most construction agencies have a quality management system to control and manage the quality of their final product. Once the project is over, the tests results are usually kept in archives with no use. Project bidding is a time when the quality information could be very helpful to identify qualified contractors. The proposed model is an effort to use quality tests in evaluating the contractor performance. The composite percent defective is proposed as the quality measure which combines percent defectives of a number of selected quality characteristics. The trend analysis is used to provide a better look at the contractor performance. The significance of the proposed measure is in its ability to reflect the true quality of the contractor work being calculated based on actual tests results.

[1]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[2]  T. L. Saaty,et al.  Decision making with dependence and feedback , 2001 .

[3]  Douglas W. Hubbard,et al.  How to Measure Anything: Finding the Value of "Intangibles" in Business , 2007 .

[4]  John P. Zaniewski,et al.  Evaluation of quality control parameters for Superpave hot mix asphalt , 2013 .

[5]  John T Harvey,et al.  Performance-based pay factors for asphalt concrete construction: comparison with a currently used experience-based approach , 2004 .

[6]  Zhanmin Zhang,et al.  Incorporating Variability into Pavement Performance, Life-Cycle Cost Analysis, and Performance-Based Specification Pay Factors , 2005 .

[7]  Magdy Abdelrahman,et al.  Evaluation of Superpave Construction Quality on Low Volume Roads (With Discussion) , 2008 .

[8]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[9]  Philip Bromiley,et al.  Strategic decision making , 2012 .

[10]  Michael I Hammons,et al.  Highway Construction Quality Index for Florida , 2008 .

[11]  James L Burati,et al.  OPTIMAL PROCEDURES FOR QUALITY ASSURANCE SPECIFICATIONS , 2003 .

[12]  Thomas L. Saaty,et al.  Decision Making for Leaders: The Analytical Hierarchy Process for Decisions in a Complex World , 1982 .

[13]  N. Bhushan,et al.  Strategic Decision Making: Applying the Analytic Hierarchy Process , 2004 .

[14]  Richard M Weed A Rational Method for Relating As-Built Quality to Pavement Performance and Value , 1998 .

[15]  Richard M Weed Method to Model Performance Relationships and Pay Schedules , 2000 .

[16]  R J Cominsky,et al.  Quality control and acceptance of Superpave-designed hot mix asphalt , 1998 .

[17]  Amr Kandil,et al.  Implementing Percent Within Limits for Hot Mix Asphalt , 2007 .