Comparison of Order Review and Release techniques in a dynamic and uncertain job shop environment

This paper proposes a new methodological pattern to assess the effectiveness of Order Review and Release (ORR) techniques in a job shop environment. The standpoint for this new method lies in the following remarks: (i) comparisons among ORR models should be performed in dynamic and uncertain environments; (ii) ORR techniques robustness toward the shop uncertainty and perturbations should be considered; and (iii) ORR models should be compared by changing their features one at a time, instead of comparing completely different ORR techniques. Consistently, we present a comparison among three ORR models, previously developed in literature, aimed at investigating: (i) the impact of a dynamic and uncertain environment on the performances achieved; (ii) the robustness of these ORR models when facing some environmental perturbations, like the system workload, the mix imbalance, the machine unavailability and the processing time variability, that usually take place in real life job shops; and (iii) the overall eff...

[1]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[2]  Wallace J. Hopp,et al.  Throughput of a constant work in process manufacturing line subject to failures , 1991 .

[3]  Lawrence D. Fredendall,et al.  Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .

[4]  Douglas C. Montgomery,et al.  Introduction to Statistical Quality Control , 1986 .

[5]  Haruki Matsuura,et al.  Sequencing, dispatching and switching in a dynamic manufacturing environment , 1993 .

[6]  Wolfgang Bechte Load-oriented manufacturing control just-in-time production for job shops , 1994 .

[7]  John B. Jensen,et al.  An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .

[8]  Haruki Matsuura,et al.  Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times , 1995 .

[9]  Jr. Joseph J. Pignatiello An Overview of the Strategy and Tactics of Taguchi , 1988 .

[10]  Paul M. Bobrowski Implementing a loading heuristic in a discrete release job shop , 1989 .

[11]  Marco Garetti,et al.  On-line loading and dispatching in flexible manufacturing systems , 1990 .

[12]  Claude Dennis Pegden Introduction to SIMAN , 1988, WSC '88.

[13]  Lawrence D. Fredendall,et al.  Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop , 1995 .

[14]  Don T. Phillips,et al.  A comparison of order release strategies in production control systems , 1992 .

[15]  Leon F. McGinnis,et al.  Shop operating characteristics curves for shop control , 1989 .

[16]  C. L. Moodie,et al.  A Dispatching Methodology for Balancing Workload Assignments in a Job Shop Production Facility , 1972 .

[17]  Ziaul Huq,et al.  The sensitivity of job mix and load capacity bottlenecks on inventory and due date performance in a manufacturing system , 1995 .

[18]  Brian G. Kingsman,et al.  A Decision Support System for Job Release in Make‐to‐order Companies , 1991 .

[19]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[20]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[21]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[22]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[23]  Paul S. Park,et al.  Workload smoothing in a bottleneck job shop , 1996 .

[24]  Roberto Cigolini,et al.  Order review and release strategies ina job shop environment: A review and a classification , 1997 .

[25]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[26]  Wolter J. Fabrycky,et al.  An Input/Output Control System For The Dynamic Job Shop , 1987 .

[27]  J. Wolfowitz,et al.  Introduction to the Theory of Statistics. , 1951 .

[28]  Nozer D. Singpurwalla,et al.  A BAYESIAN PERSPECTIVE ON TAGUCHT'S APPROACH TO QUALITY ENGINEERING AND TOLERANCE DESIGN , 1992 .

[29]  Richard H. Deane,et al.  A Loading and Balancing Methodology for Job Shop Control , 1974 .

[30]  Robert M. O'Keefe,et al.  An order release mechanism for a flexible flow system , 1995 .

[31]  Kwok-Leung Tsui,et al.  AN OVERVIEW OF TAGUCHI METHOD AND NEWLY DEVELOPED STATISTICAL METHODS FOR ROBUST DESIGN , 1992 .

[32]  D. R. Denzler,et al.  Evaluating variance control, order review/release and dispatching: a regression analysis , 1994 .

[33]  Warren W. Fisher,et al.  Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .

[34]  Hiroshi Awane,et al.  Input scheduling and load balance control for a job shop , 1984 .

[35]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[36]  Alberto Portioli,et al.  An enhanced loading model for the probabilistic workload control under workload imbalance , 1996 .

[37]  Linda Hendry,et al.  Alternative order release mechanisms: a comparison by simulation , 1994 .

[38]  James F. Cox,et al.  Statistical aspects in a simulation study , 1981 .

[39]  John B. Jensen,et al.  Management of Vital Customer Priorities in Job Shop Manufacturing Environments , 1994 .