Current Status and Experience of WAMS Implementation in North America

The 15 years of successful implementation of wide-area measurement systems (WAMS) in the WECC power grid have shown significant value of WAMS data in system dynamic modeling and validation, FACTS control validation and pilot implementations of wide area protection schemes. The August 14 2003 blackout in the eastern interconnection of the North America revealed the urgent need for wide-area information acquisition for better power grid operations. The Eastern interconnection phasor project (EIPP) was launched in 2003 to deploy a WAMS system in the eastern interconnection. Development of IEEE C37.118, a standard for phasor data acquisition and transmission, will aid in deployment of phasor measurement systems for WAMS applications. Technologies of phasor measurement units (PMUs) with high precision time synchronization and phasor data concentrators (PDCs) for phasor data aggregation and event recording are key to the success of WAMS implementation. This paper reviews the WAMS development in the North America and presents current and potential WAMS applications including dynamic modeling and validation and wide-area control. Past experience shows a promising future of WAMS in improving power system planning, operation and control. However, there remain challenges to make phasor measurement consistent and to meet both slow and fast data application needs

[1]  Yonghong Chen,et al.  Wide-Area Stability and Voltage Control , 2000 .

[2]  James S. Thorp,et al.  IEEE Standard for Synchrophasors for Power Systems , 1998 .

[3]  Zhenyu Huang,et al.  Model Validation of Power System Components Using Hybrid Dynamic Simulation , 2006, 2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition.

[4]  Kenneth E. Martin,et al.  WACS-Wide-Area Stability and Voltage Control System: R&D and Online Demonstration , 2005, Proceedings of the IEEE.

[5]  A.G. Phadke,et al.  Comparative testing of synchronized phasor measurement units , 2004, IEEE Power Engineering Society General Meeting, 2004..

[6]  C. W. Taylor,et al.  Model validation for the August 10, 1996 WSCC system outage , 1999 .

[7]  J. F. Hauer,et al.  Dynamic Performance Validation in the Western Power System , 2000 .

[8]  J. F. Hauer Validation of phasor calculations in the macrodyne PMU for California-Oregon Transmission Project tests of March 1993 , 1996 .

[9]  C. W. Taylor,et al.  Recording and analyzing the July 2 cascading outage [Western USA power system] , 1997 .

[10]  J. Thorp,et al.  Real Time Voltage-Phasor Measurements for Static State Estimation , 1985, IEEE Power Engineering Review.

[11]  Virgilio Centeno,et al.  An adaptive out-of-step relay [for power system protection] , 1997 .

[12]  J.F. Hauer,et al.  Performance of "WAMS East" in providing dynamic information for the North East blackout of August 14, 2003 , 2004, IEEE Power Engineering Society General Meeting, 2004..

[13]  A.G. Phadke,et al.  An Adaptive Out-of-Step Relay , 1997, IEEE Power Engineering Review.

[14]  Steven Y. Goldsmith,et al.  Software Requirements Specification for Information Management for Grid Control , 2003 .